Construction Method of Full Underground Excavation for Underground Station
A construction method and underground station technology, applied in underground chambers, earthwork drilling, shaft equipment, etc., can solve the problems of slow construction progress and slow construction progress of underground stations, and achieve the effect of ensuring that it is put into use and meets travel needs
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0032] Below by embodiment and in conjunction with accompanying drawing, the present invention will be further described:
[0033] to complete figure 1 , figure 2 The construction of the shown underground station A, and the opening to traffic of the track line B before the completion of the construction of the underground station, adopts a kind of full underground digging construction method for the underground station, including the following steps:
[0034] first step, such as Figure 4a As shown, the lower left corner pilot tunnel C and the lower right corner pilot tunnel D (referred to as "left and right pilot tunnels") in the cross-section of the excavated station. The left and right pilot tunnels are excavated by the upper and lower steps respectively, and can also be excavated by the full-section method, three-step method, CD method, etc. depending on the situation; the excavation can be excavated by shock-absorbing blasting or mechanical section excavation.
[0035...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com