Construction Method of Full Underground Excavation for Underground Station

A construction method and underground station technology, applied in underground chambers, earthwork drilling, shaft equipment, etc., can solve the problems of slow construction progress and slow construction progress of underground stations, and achieve the effect of ensuring that it is put into use and meets travel needs

Active Publication Date: 2019-09-06
CRRC CONSTR ENG CO LTD
View PDF6 Cites 0 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0003] Moreover, underground stations are often close to surrounding buildings and structures, sometimes even directly below them. At this time, the construction of the station has a greater impact on the surrounding environment. Therefore, various measures must be taken during construction to reduce the impact on the surrounding environment. slow
[0004] The above reasons directly lead to the slow construction progress of the underground station, but the tunnel must wait until the construction of the underground station is completed before it can be opened to traffic. Therefore, the construction of the underground station often becomes a key node in the construction period and an important restrictive factor for the opening to traffic

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Construction Method of Full Underground Excavation for Underground Station
  • Construction Method of Full Underground Excavation for Underground Station
  • Construction Method of Full Underground Excavation for Underground Station

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0032] Below by embodiment and in conjunction with accompanying drawing, the present invention will be further described:

[0033] to complete figure 1 , figure 2 The construction of the shown underground station A, and the opening to traffic of the track line B before the completion of the construction of the underground station, adopts a kind of full underground digging construction method for the underground station, including the following steps:

[0034] first step, such as Figure 4a As shown, the lower left corner pilot tunnel C and the lower right corner pilot tunnel D (referred to as "left and right pilot tunnels") in the cross-section of the excavated station. The left and right pilot tunnels are excavated by the upper and lower steps respectively, and can also be excavated by the full-section method, three-step method, CD method, etc. depending on the situation; the excavation can be excavated by shock-absorbing blasting or mechanical section excavation.

[0035...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

PUM

No PUM Login to view more

Abstract

The invention discloses a full underground excavation construction method for a underground station. The full underground excavation construction method for the underground station includes the stepsof: firstly, performing lower left corner and lower right corner pilot tunnels of a underground excavation cross section; secondly, constructing initial support and secondary lining in the lower leftcorner pilot tunnel and lower right corner pilot tunnel as well as constructing an end base plate, a side wall, an end floor slab, a frame column and an end platform plate, and then completing track laying, power supply and communication to ensure the station to have traffic conditions ahead of time; thirdly, conducting underground excavation of the upper half portion of the station cross sectionand constructing initial support and secondary lining of the upper half portion; fourthly, conducting underground excavation of central geotechnical of the station cross section from top to down; fifthly, constructing a central base plate, a central floor slab and a central platform board of the station cross section. The full underground excavation construction method for the underground stationhas the advantages of guaranteeing the station to have the traffic conditions ahead of time, realizing early opening of a track line before the completion of the underground excavation station, thereby ensuring that that the track line will be put into use as soon as possible, and satisfying people's travel needs.

Description

technical field [0001] The invention relates to the technical field of tunnel construction, in particular to a full-underground excavation construction method for an underground station. Background technique [0002] figure 1 , figure 2 Shown is the layout of underground station A and track line B. Existing underground stations either adopt full surface excavation or full underground excavation, but no matter which kind of excavation method is used, the station can only be opened to traffic after the excavation of the station is completed. The traditional full underground excavation of underground stations mostly adopts step-by-step excavation methods. Common step-by-step excavation methods include CD method, CRD method, double-side-wall pilot pit method, etc. The step-by-step excavation method has more construction steps, and the overall construction speed is slower. image 3 It is a traditional construction method for underground excavation of underground stations. Pa...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

Application Information

Patent Timeline
no application Login to view more
Patent Type & Authority Patents(China)
IPC IPC(8): E21D9/00E21D11/00
Inventor 王猛李勇殷立达聂鑫路张宇川许满吉王成
Owner CRRC CONSTR ENG CO LTD
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products