Excavation construction method of dark first and then bright in underground station

A technology for underground stations and construction methods, applied in underground chambers, artificial islands, earth-moving drilling, etc., can solve the problems of low construction efficiency, small application scope, occupying urban ground space, etc., so as to improve construction efficiency and shorten construction period. , the effect of reducing the time occupied by the urban ground

Active Publication Date: 2020-05-12
CRRC CONSTR ENG CO LTD
View PDF6 Cites 0 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

Since full open excavation takes a long time and occupies a large area of ​​urban ground space, the scope of application is very small, so full open excavation construction is mostly used; compared with full open excavation construction, the construction efficiency is significantly lower
[0003] However, no matter which excavation method is used, it can only be opened to traffic after the excavation of the station is completed.
At the same time, since underground stations are often close to surrounding buildings and structures, and sometimes even directly below them, various measures need to be taken during construction to reduce the impact on the surrounding environment, which will also lead to slow construction progress

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Excavation construction method of dark first and then bright in underground station
  • Excavation construction method of dark first and then bright in underground station
  • Excavation construction method of dark first and then bright in underground station

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0026] Below by embodiment and in conjunction with accompanying drawing, the present invention will be further described:

[0027] to complete figure 1 , figure 2 The construction of the shown underground station A, and the opening to traffic of the track line B before the completion of the construction of the underground station, adopts an excavation construction method in which the underground station is first dark and then bright, including the following steps:

[0028] first step, such as Figure 4a As shown, the lower left corner pilot tunnel C and the lower right corner pilot tunnel D (referred to as "left and right pilot tunnels") in the cross-section of the excavated station. The left and right pilot tunnels are excavated by the upper and lower steps respectively, and can also be excavated by the full-section method, three-step method, CD method, etc. depending on the situation; the excavation can be excavated by shock-absorbing blasting or mechanical section excava...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

PUM

No PUM Login to view more

Abstract

The invention discloses an underground station underground-and-then-open excavation construction method. The underground station underground-and-then-open excavation construction method comprises thesteps that 1, lower left corner guiding holes and lower right corner guiding holes of the cross section of a station are subjected to underground excavation; 2, primary supports, secondary linings, end bottom plates, side walls, end floor slabs, frame columns and end platform plates are constructed in the lower left corner guiding holes and the lower right corner guiding holes, and then track laying, power supplying and communicating are completed; 3, unprotected open cut excavation is conducted above the station till the positions of the end floor slabs of the station are reached, and centralrock soil between the lower left corner guiding holes and the lower right corner guiding holes is excavated; 4, central bottom plates, central floor slabs, central platform plates and a vault of thecross section of the station are constructed; and 5, backfilling is conducted above the station. The station meets the open traffic condition in advance, and advanced open traffic is achieved before underground excavation construction of the underground station of a track line is completed; and the whole construction period of the underground station is shortened, the construction efficiency is improved, the time of city ground occupying is reduced, and the advantages of full open excavation and full underground excavation are both taken into consideration.

Description

technical field [0001] The invention relates to the technical field of tunnel construction, in particular to an excavation construction method in which an underground station is first darkened and then brightened. Background technique [0002] figure 1 , figure 2 Shown is the layout of underground station A and track line B. Existing underground stations either adopt full underground excavation or full open excavation. Since full open excavation takes a long time and occupies a large area of ​​urban ground space, the scope of application is very small, so full open excavation construction is mostly used; compared with full open cut construction, the construction efficiency of full open excavation construction is significantly lower. [0003] But no matter which kind of excavation method, it is necessary to open to traffic after the excavation of the station is completed. At the same time, since underground stations are often close to surrounding buildings and structures...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

Application Information

Patent Timeline
no application Login to view more
Patent Type & Authority Patents(China)
IPC IPC(8): E21D13/02E21D11/00E02D29/045
CPCE02D29/045E21D11/00E21D13/00
Inventor 王猛李勇聂鑫路张宇川殷立达许满吉王成
Owner CRRC CONSTR ENG CO LTD
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products