Anti-blocking quick well completion slotting blasthole arrangement structure and blasting method thereof
A technology of layout structure and anti-clogging, applied in the field of rock blasting, can solve problems such as low efficiency of patio excavation, and achieve the effect of improving blasting effect and improving excavation efficiency.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment
[0034] see figure 1 and figure 2 , the anti-clogging rapid well-cutting blast hole layout structure in the illustration is the preferred solution of the present invention, specifically including a central hole 1 drilled in the center of the patio, several cutting holes 2 set around the central hole 1, and surrounding cut holes. Auxiliary hole 3 and peripheral hole 4 are arranged in slot hole 2, among which cut hole 2, auxiliary hole 3 and peripheral hole 4 are the main blast holes, and central hole 1 provides compensation space for the initial blasting of cut hole and improves the cutting The blasting gravel throwing ability and the rock-breaking ability to enhance the rock gripping of the cutting part.
[0035] Divide the central hole 1, the cut hole 2, the auxiliary hole 3 and the peripheral hole 4 into the same layers I, II, and III along the depth direction, and charge each layer in layers.
[0036] Concretely, the aperture of central hole 1 will be greater than the ape...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 