How to remove the steel support
A steel support and channel steel technology, applied in excavation, construction, infrastructure engineering and other directions, can solve the problems of hoisting equipment unable to cover the foundation pit, affecting building construction efficiency, and long support removal time.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0039] see figure 1 , around the foundation pit is provided with surrounding protection piles 81, inside the surrounding protection piles 81 is provided with surrounding purlins 82, the steel support 10 is supported on the surrounding purlins 82, in this embodiment, the steel support 10 has two parallel The first main beam 13 is fixed with a first cross brace 12 between the two first main beams 13, the two first main beams 13 are made of first H-shaped steel, and the flange 15 of the first H-shaped steel is arranged horizontally, The upper side 16 of the upper flange of the first H-shaped steel forms the top surface, the first cross brace 12 is made of the second H-shaped steel, and the flange of the second H-shaped steel is arranged horizontally. A column 31 is arranged in the foundation pit, a steel corbel 35 is welded on the column 31 , a first joist 32 is erected on the steel corbel 35 , and the steel support 10 is movably supported on the first joist 32 . The steel suppo...
Embodiment 2
[0062] see Figure 13 , this embodiment is basically the same as Embodiment 1, the difference is that a support member for supporting the channel steel 113 is provided below the channel steel 113 as a temporary track, and in this embodiment, the support member is a flange horizontally arranged H-shaped steel A114, the flange of the H-shaped steel A114 is set horizontally, and the channel steel 113 is directly placed on the upper flange of the H-shaped steel A114. The addition of H-shaped steel A114 can effectively increase the bearing capacity of the temporary track, avoiding deformation under the pressure of the dismantling section and affecting the dismantling progress. It can be understood that in other embodiments, the support member can also use I-beam, pipe steel, and other truss-like structural members with supporting functions formed by plates or profiles.
Embodiment 3
[0064] This embodiment is basically the same as Embodiment 1, the difference is that the lifting methods for each disassembly section are different, please refer to Figure 10 , in this embodiment, the lifting device includes a door-shaped bracket 71 supported on the bottom surface B300 of the foundation pit, a winding device 73 fixed on the beam 72 of the door-shaped bracket 71, and a first winding device installed on the winding device. The suspension hook 74, the winding device 73 and the first suspension hook 74 jointly form a lifting part, and in step (2), the first suspension hook 74 is hooked on the two second main beams 23 of the first disassembly section A104 side flange, and do the same when removing the other disassembly sections. Of course, in other embodiments, the first hook 74 can also be hooked on the flanges of the lower sides of the two second main beams 23 of the first dismantling section A104, and the same method is used for dismantling other dismantling se...