Construction method for one-time horizontal backfill of concrete in pipe roofing steel pipe
A construction method and concrete technology, which can be applied in basic structure engineering, construction, etc., can solve problems such as small longitudinal slope and complex staggered pipelines in the pipe
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment
[0025] figure 1 It is a schematic diagram of the plugging pipe curtain structure of a construction method embodiment of a one-time horizontal backfilling of concrete in a pipe curtain steel pipe of the present invention; figure 2 It is a schematic diagram of the structure of the pumping end of the pipe curtain in the embodiment of the construction method of one-time horizontal backfilling of concrete in the steel pipe of the pipe curtain; image 3 It is a side view of the pipe curtain pumping end of the construction method embodiment of the one-time horizontal backfilling of concrete in the pipe curtain steel pipe of the present invention; Figure 4 It is a schematic diagram of the structure of the pipe curtain grouting end of the construction method embodiment of the one-time horizontal backfilling of concrete in the pipe curtain steel pipe of the present invention. As shown in the figure, the present invention provides a construction of the one-time horizontal backfilling o...
PUM

Abstract
Description
Claims
Application Information

- R&D
- Intellectual Property
- Life Sciences
- Materials
- Tech Scout
- Unparalleled Data Quality
- Higher Quality Content
- 60% Fewer Hallucinations
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2025 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com