Electric energy quality data-based high-speed railway line vehicle operating time period determination method and device
A technology of power quality and judgment method, which is applied in the direction of reactive power compensation, reactive power adjustment/elimination/compensation, etc., and can solve problems such as indistinguishability
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0027] The following will clearly and completely describe the technical solutions in the embodiments of the present invention with reference to the accompanying drawings in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of them. Based on the embodiments of the present invention, all other embodiments obtained by persons of ordinary skill in the art without creative efforts fall within the protection scope of the present invention.
[0028] The present invention provides a method for judging the time period of high-speed railway lines based on power quality data, referring to figure 1 , the method includes the steps of:
[0029] Step S10, obtaining high-speed railway power quality monitoring data;
[0030] Step S20, normalizing the active power of the high-speed railway power quality monitoring data;
[0031] Step S30, performing frequency statistics on the normalized active pow...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com