Homemade ice special preparation device and preparation method
A preparation device and a stirring device technology, applied in ice making, ice making, application, etc., can solve problems such as residues, achieve simple structure, save engraving time, and save production costs
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
specific Embodiment approach 1
[0025] Specific implementation mode one: combine Figure 1-Figure 3 Description of this embodiment, the special preparation device for self-made ice in this embodiment includes a lower column 1, an upper column 2, a support beam 3, a rotary device 4, a lifting mechanism 5, a stirring device 6 and an ice-making template container 7, and the upper column 2 passes through The slewing device 4 is installed on the lower column 1, two supporting beams 3 are installed in parallel on the side wall of the upper column 2, the lifting mechanism 5 is installed on the supporting beam 3, and the stirring device 6 is installed on the lifting mechanism 5 , an ice-making template container 7 is arranged below the stirring device 6 . In this way, the upper column 2 can rotate relative to the lower column 1. When making ice, a plurality of ice-making formwork containers 7 are arranged around the lower column 1 and the upper column 2, and the upper column 2 drives the stirring machine installed o...
specific Embodiment approach 2
[0026] Specific implementation mode two: combination Figure 1-Figure 3 Describe this embodiment, the special preparation device for self-made ice in this embodiment, the said rotary device 4 includes the lower mounting base 9, the upper mounting base 10, the turbine 11 and the worm 12, and the said lower mounting base 9 is welded and installed on the lower column 1 At the upper end, an upper column 2 is welded on the upper mounting surface of the upper mounting base 10, and the lower mounting surface of the upper mounting base 10 is fixed on the upper end surface of the turbine 11 by bolts, and the turbine 11 and the lower mounting base 9 are installed through bearings. Also be welded with worm screw support 13 on the side of seat 10, worm screw 12 is rotatably installed in the worm screw support 13, and the installed worm screw 12 and turbine wheel 11 engagement installations. In this way, the rotation of the worm 12 drives the turbine 11 to rotate, and at this time, the upp...
specific Embodiment approach 3
[0027] Specific implementation mode three: combination Figure 1-Figure 3 Describe this embodiment, the self-made ice preparation device of this embodiment, the lifting mechanism 5 includes a lifting motor 23, a drum 14, a vertical mounting plate 15, a slide rail 16, a slider 17 and a stirring device mounting frame 18, vertically Mounting plate 15 is welded and installed on support beam 3, and motor bracket 8 is installed on the vertical mounting plate 15 upper end, and lifting motor 23 is installed on the motor bracket 8, and cylinder 14 is installed on the output end of lifting motor 23, and described vertical Slide rail 16 is installed on the side of mounting plate 15, and stirring device mounting frame 18 cooperates installation with slide rail 16 by slide block 17, and the steel wire rope on the upper end of stirring device mounting frame 18 and cylinder 14 is established to be connected, and stirring device mounting frame 18 A stirring device 6 is installed. So set, the...