Excavation method of arched ground survey leveling tunnel based on small tbm roadheader

A kind of roadheader, small technology, used in earth-moving drilling, mining equipment, tunnels and other directions, can solve the problems of high construction cost, single shape of the cavern, poor stability of the cavern, etc. The effect of high rate, easy to move and hoist

Active Publication Date: 2020-09-29
POWERCHINA XIBEI ENG
View PDF5 Cites 0 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0012] The purpose of the present invention is to overcome above-mentioned deficiencies in the prior art, provide the excavation method based on the small-sized TBM roadheader of arched ground survey flat hole, overcome 1 in the prior art: the tunnel construction of narrow space also stays in manual drilling and blasting, every day The excavation speed is only 0.5m ~ 1.5m, the construction cost is high, the risk is high, and the construction accident rate is high; 2: The traditional artificial drilling and blasting method has low efficiency and long exploration time, which cannot meet the needs of planning and design progress nodes, and pyrotechnic materials Difficult supply, soaring labor costs, 3: Due to the large change in lithology of composite formations, it is difficult to control the section shape of the traditional drilling and blasting method, the stability of the cavern is poor, and the shape of the cavern is single, etc.

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Excavation method of arched ground survey leveling tunnel based on small tbm roadheader
  • Excavation method of arched ground survey leveling tunnel based on small tbm roadheader

Examples

Experimental program
Comparison scheme
Effect test

specific Embodiment approach

[0035] It should be noted that the structures, proportions, sizes, etc. shown in this specification are only used to match the content disclosed in the specification, for those who are familiar with this technology to understand and read, and are not used to limit the conditions for the implementation of the present invention. Any modification of structure, change of proportional relationship or adjustment of size shall still fall within the scope covered by the technical contents disclosed in the present invention without affecting the functions and objectives of the present invention.

[0036] At the same time, terms such as "upper", "lower", "left", "right", "middle" and "one" quoted in this specification are only for the convenience of description and are not used to limit this specification. The practicable scope of the invention and the change or adjustment of its relative relationship shall also be regarded as the practicable scope of the present invention without any su...

Embodiment 1

[0039] The invention discloses a tunneling method for an arched ground survey leveling hole based on a small TBM roadheader, which comprises the following steps:

[0040] Step 1) Carry out construction stakeout, determine the actual position of the entrance of the first ground survey leveling hole on the mountain, and then build a small TBM construction platform at the position of the first ground survey leveling hole entrance, wherein the small TBM construction platform can move up and down, left and right;

[0041] Step 2) Hoist the small TBM roadheader to the entrance of the first ground survey leveling hole, and set it on the small TBM construction platform described in step 1); use a total station or compass for positioning, and determine the excavation direction of the first ground survey leveling hole and slope;

[0042] Step 3) Align the small TBM roadheader with the center line of the entrance of the first ground survey flat hole, start the small TBM roadheader to exc...

Embodiment 2

[0047] The invention discloses a tunneling method for an arched ground survey leveling hole based on a small TBM roadheader, which comprises the following steps:

[0048] Step 1) Carry out construction stakeout, determine the actual position of the entrance of the first ground survey leveling hole on the mountain, and then build a small TBM construction platform at the position of the first ground survey leveling hole entrance, wherein the small TBM construction platform can move up and down, left and right;

[0049] Step 2) Hoist the small TBM roadheader to the entrance of the first ground survey leveling hole, and set it on the small TBM construction platform described in step 1); use a total station or compass for positioning, and determine the excavation direction of the first ground survey leveling hole and slope;

[0050] Step 3) Align the small TBM roadheader with the center line of the entrance of the first ground survey flat hole, start the small TBM roadheader to exc...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention discloses an arched geological exploration adit tunneling method based on a small TBM. According to the arched geological exploration adit tunneling method based on the small TBM, the requirements of small disturbance to surrounding rock, good adit chamber stability, a level and smooth and round tunneling face, accurate positioning, no back break and the like can be met, and the effects of high efficiency, good quality, technical feasibility, economic rationality, safety and environmental protection and the like are achieved; the small TBM with the diameter of 1.0 m, 1.5 m or 2 mis utilized, the small TBM has the characteristics of light weight, dexterity, easy moving and handling and the like, in addition, the equipment power is relatively small, used auxiliary facilities and the like are relatively less, so that the small TBM is used for alpine and gorge regions and narrow site regions, and the range of application is wide; and compared with an existing square, rectangular or a circular adit, a geological exploration adit obtained by the tunneling method is in an arch shape and has the advantages that the adit chamber stability is good, the adit chamber usage rateis high, and the digging amount is less.

Description

technical field [0001] The invention belongs to the field of geological exploration in the early stage of water conservancy and hydropower projects, and in particular relates to a method for excavating an arched ground leveling hole based on a small TBM roadheader, in particular to an arched leveling hole for ground leveling based on a small TBM roadheader with a diameter of 1.0m, 1.5m or 2m. Excavation method. Background technique [0002] In recent years, with the huge demand for water resource development in the western region, the rational development of water resources such as "transmitting power from west to east" and "transmitting Tibetan power to outside" has become a major issue in ensuring my country's energy security, improving energy structure, and optimizing regional water resource allocation. strategic move. Laxiwa, Jinping, Xiaowan and other 300m-level hydropower stations have been built and put into operation; currently in the Qinghai-Tibet Plateau area, the ...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Patents(China)
IPC IPC(8): E21D9/00E21D9/11E21D9/12
CPCE21D9/00E21D9/003E21D9/11E21D9/12
Inventor 赵志祥王有林赵悦
Owner POWERCHINA XIBEI ENG
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products