Excavation method of arched ground survey leveling tunnel based on small tbm roadheader
A kind of roadheader, small technology, used in earth-moving drilling, mining equipment, tunnels and other directions, can solve the problems of high construction cost, single shape of the cavern, poor stability of the cavern, etc. The effect of high rate, easy to move and hoist
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
specific Embodiment approach
[0035] It should be noted that the structures, proportions, sizes, etc. shown in this specification are only used to match the content disclosed in the specification, for those who are familiar with this technology to understand and read, and are not used to limit the conditions for the implementation of the present invention. Any modification of structure, change of proportional relationship or adjustment of size shall still fall within the scope covered by the technical contents disclosed in the present invention without affecting the functions and objectives of the present invention.
[0036] At the same time, terms such as "upper", "lower", "left", "right", "middle" and "one" quoted in this specification are only for the convenience of description and are not used to limit this specification. The practicable scope of the invention and the change or adjustment of its relative relationship shall also be regarded as the practicable scope of the present invention without any su...
Embodiment 1
[0039] The invention discloses a tunneling method for an arched ground survey leveling hole based on a small TBM roadheader, which comprises the following steps:
[0040] Step 1) Carry out construction stakeout, determine the actual position of the entrance of the first ground survey leveling hole on the mountain, and then build a small TBM construction platform at the position of the first ground survey leveling hole entrance, wherein the small TBM construction platform can move up and down, left and right;
[0041] Step 2) Hoist the small TBM roadheader to the entrance of the first ground survey leveling hole, and set it on the small TBM construction platform described in step 1); use a total station or compass for positioning, and determine the excavation direction of the first ground survey leveling hole and slope;
[0042] Step 3) Align the small TBM roadheader with the center line of the entrance of the first ground survey flat hole, start the small TBM roadheader to exc...
Embodiment 2
[0047] The invention discloses a tunneling method for an arched ground survey leveling hole based on a small TBM roadheader, which comprises the following steps:
[0048] Step 1) Carry out construction stakeout, determine the actual position of the entrance of the first ground survey leveling hole on the mountain, and then build a small TBM construction platform at the position of the first ground survey leveling hole entrance, wherein the small TBM construction platform can move up and down, left and right;
[0049] Step 2) Hoist the small TBM roadheader to the entrance of the first ground survey leveling hole, and set it on the small TBM construction platform described in step 1); use a total station or compass for positioning, and determine the excavation direction of the first ground survey leveling hole and slope;
[0050] Step 3) Align the small TBM roadheader with the center line of the entrance of the first ground survey flat hole, start the small TBM roadheader to exc...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com