7 results about "Technical feasibility" patented technology

Technical feasibility study This is one of the first studies that must be conducted after the project has been identified. In large engineering projects consulting agencies that have large staffs of engineers and technicians conduct technical studies dealing with the projects. In individual agricultural projects financed by local agricultural credit corporations, the technical staff composed of specialized agricultural engineers, irrigation and construction engineers, and other technicians are responsible for conducting such feasibility studies.The fields of the technical study can be determined as follows:-

BIM + AI-based steel bridge full-life-cycle design method and system and medium

The invention relates to a BIM + AI-based steel bridge full-life-cycle design method and system and a medium, and the method comprises the following steps: constructing a steel bridge BIM parameterized component library, the component library comprises standardized parameter components of beam segments, nodes, supports and connecting pieces, and each component has multi-dimensional data of geometric information, material attributes, mechanical parameters and cost information; establishing a data standard based on an IFC extension standard, and newly adding design parameters, material attributes, a construction process, a monitoring sensor and a steel bridge specific attribute set of maintenance records on the basis of an IFC framework; and deploying an AI engine, wherein the AI engine comprises a structure type selection recommendation model based on the historical project database. Through AI-driven intelligent design assistance, the structure type selection recommendation model can quickly give technical feasibility scores, economic scores and comprehensive recommendation indexes based on not less than 10,000 groups of historical project data, and a traditional trial and error process depending on experience is avoided.
Owner:CHINA HIGHWAY ENG CONSULTING GRP CO LTD

Method and system for accurately determining novelty rate based on technical state parameters of equipment

The invention relates to a method and a system for accurately determining a novelty rate based on technical state parameters of equipment, and aims to solve the problem of asset loss caused by lack of technical parameters in traditional asset assessment. And scientific quantification of the value of the overdue service equipment is realized in combination with an equipment full-life-cycle database and an expert auditing mechanism. The matching system adopts a micro-service architecture, integrates data acquisition, calculation and early warning modules, and is automatically associated with a financial management system to ensure that the evaluation result is traceable and verifiable. The embodiment shows that the method can improve the renewal rate of overdue service equipment in the industries of metallurgy, electric power and the like by 30%-60%, effectively avoids asset value reduction loss caused by overlong depreciation years, provides data support for equipment updating cycle optimization, has technical feasibility and economic rationality, and provides a systematic solution for asset value preservation and value increment.
Owner:陈后宋

Ecological restoration document intelligent generation and review method, system, equipment and medium

The invention relates to the technical field of artificial intelligence, in particular to an ecological restoration document intelligent generation and review method and system, equipment and a medium. According to the method, intelligent retrieval is carried out through the pre-established knowledge base, and laws and regulations, typical cases and expert knowledge related to project features are obtained; analyzing and processing the knowledge content by using a pre-trained machine learning model, and generating an implementation scheme framework; performing intelligent filling based on the framework to form a first draft of the scheme; performing compliance, integrity, logicality and technical feasibility examination by adopting a rule engine, and giving modification suggestions; according to the method, historical experience is fully utilized, scientificity and feasibility of the scheme are guaranteed, a quality control mechanism is established, and document compiling efficiency and quality level are improved.
Owner:GUANGZHOU GUOCE PLANNING INFORMATION TECH CO LTD

Calculation method of scientific and technological achievement feasibility analysis system

According to the calculation method of the scientific and technological achievement feasibility analysis system, the achievement conversion rate is comprehensively and accurately analyzed and evaluated from technical feasibility, economic feasibility, market feasibility and operation feasibility, the reliability and accuracy of scientific and technological achievement feasibility analysis are improved, the scientific and technological achievement conversion rate is increased, and the industry development speed is increased; the transformation period and the transformation quantity of scientific and technological achievements are stably improved; and the industry is helped to make an accurate emergency strategy.
Owner:NANAN ZHONGTIAN TECHNOLOGY SERVICE CO LTD

Technical feasibility analysis method, device and equipment for reconnecting thermal power plant to local power grid and storage medium

The invention discloses a technical feasibility analysis method, device and equipment for reconnecting a thermal power plant to a local power grid, and a storage medium, and relates to the technical field of power system planning, and the method comprises the steps: obtaining unit parameters and electrical layout data of the thermal power plant, and power supply planning data, grid structure data and power demand prediction data of the local power grid; according to the unit parameters, the power supply planning data, the grid structure data and the power demand prediction data, carrying out electric power and electric quantity balance analysis and peak regulation balance analysis on the local power grid, and determining a target consumption area after reconnection of the thermal power plant; generating a thermal power plant reconnection scheme based on the unit parameters, the electrical layout data, the target absorption area and a preset voltage grade regulation; and analyzing the technical feasibility of the reconnection scheme of the thermal power plant through electrical calculation to obtain an analysis result. The technical feasibility of connecting the large-scale thermal power plant to the local power grid can be analyzed, so that the safe and stable operation of the local power grid is ensured.
Owner:POWERCHINA ZHONGNAN ENG

Updating, transforming and evaluating method for water-turbine generator set

PendingCN121760874AComprehensive decision-making basisScientific basis for decision-makingMachines/enginesDesign optimisation/simulationModel testElectric equipment
The invention discloses a water-turbine generator set updating transformation and evaluation method, and relates to the technical field of water-turbine generator sets. According to the method, starting from power station and unit parameter collection, the transformation range is preliminarily judged in combination with maintenance, operation and vibration throw data, then core analysis is carried out on whether a runner is transformed or not, the power generation potential improvement requirement, the capacity increasing target and scheme determination, and technical feasibility is verified through CFD simulation and model tests; and rechecking the adaptability of the auxiliary system, the electrical equipment and the basic structure, and finally combining investment estimation and economic evaluation to output a decision basis. According to the method, the whole transformation process is covered, the technical rationality and economic benefits are considered, the transformation range can be accurately defined, the problems of efficiency attenuation of old units, insufficient adaptive power grid capacity and the like are solved, scientific support is provided for power station transformation decision making, and reference is provided for similar projects.
Owner:HUBEI QINGJIANG HYDROPOWER DEV +1

Machine learning-based shield synchronous grouting material proportioning management method and system

This invention discloses a machine learning-based method and system for managing the proportion of materials used in shield tunneling synchronous grouting, relating to the field of material preparation and proportion management. This invention enhances the generalization ability and prediction accuracy of the model by combining simplified model data expansion with standard model construction. An iterative adjustment mechanism is introduced to automatically correct substandard proportion schemes until a set of candidates meeting all performance requirements is obtained. During the proportion selection stage, raw material storage limitations and economic factors are comprehensively considered, prioritizing schemes with sufficient inventory. When inventory is insufficient, a cost optimization strategy is adopted, effectively balancing technical feasibility and economic rationality. Finally, multi-objective optimization is achieved through performance index weighting, ensuring that the selected proportion scheme meets engineering performance requirements while possessing the best overall benefits. The entire process is highly automated, reducing human trial-and-error costs and improving the efficiency of proportion design and the level of engineering quality control.
Owner:SHANGHAI RAIL TRANSIT ENG CO LTD OF CHINA RAILWAY 17 BUREAU GRP +2