Dredged polluted bottom sludge rapid dehydration solidification stabilization integrated method and equipment
A technology of polluted sediment and rapid dewatering, applied in chemical instruments and methods, water/sludge/sewage treatment, polluted waterway/lake/pond/river treatment, etc., can solve the problem of increasing the cost of dredging sediment treatment, ecological Environmental pollution, poor applicability and other problems, to achieve the effect of improving dehydration treatment efficiency, reducing pollutant discharge, saving site and cost
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
specific Embodiment 1
[0042] The dredged bottom mud used in this embodiment is the South Lake bottom mud in Wuhan. According to the initial moisture content of the dredged bottom mud and the concentration value of the initial pollution heavy metal zinc, the water content is adjusted to 300% in this embodiment, and the concentration value of the heavy metal zinc pollution is 800mg / kg, so that the treatment objects of the experimental group and the control group are consistent, and it is convenient to directly compare the difference in treatment effect.
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com