Cross-grid scheduling work order creation method
A grid and work order technology, applied in the field of cross-grid scheduling work order creation, can solve problems such as high labor costs, easy omissions, and heavy scheduling tasks, and achieve the effect of reducing labor costs and improving creation efficiency
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0030] The present invention will be specifically introduced below in conjunction with the accompanying drawings and specific embodiments.
[0031] Such as figure 1 As shown, the method for verifying the vehicle charge or refueling quantity provided by the embodiment of the present invention includes the following steps:
[0032] S101. Obtain the number of vehicles in each current parking network, set the parking network whose number is greater than or equal to the set threshold as the starting grid, and set the parking network whose number is less than the set threshold as the vehicle return grid.
[0033] As a specific embodiment, the normal number of vehicles in each parking network is set to 10, and if the current number of vehicles in a certain parking network is 5, then the parking network is set as the vehicle return grid.
[0034] S102. Acquiring the status of the vehicles in each parking network from the vehicle management system in real time, wherein the status of t...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com