Maintenance warehouse for bridge overhaul equipment
A technology for equipment maintenance and bridges, applied in bridge construction, bridges, bridge parts, etc., can solve the problems of device damage, waste of labor, increase of bridge inspection time, etc., and achieve the effects of saving construction period, improving economic efficiency, and saving labor
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0032] A maintenance warehouse for bridge maintenance equipment, comprising a warehouse body 1, a central hollow part 2 in the middle of the warehouse body 1; a rectangular hollow part 3 formed by extending outward from both sides of the bottom end of the side wall of the warehouse body 1; a sealing part is installed in conjunction with the central hollow part 2 ; The central hollow part 2 is equipped with functional equipment, and the warehouse body 1 is formed with a reserved opening 5 that cooperates with the support shaft. The reserved opening 5 is on the bottom wall of the rectangular cavity 3 . The shell of the bin body 1 has an inner cavity 7; the inner cavity 7 is equipped with a sealing part; the sealing part is used to close the central hollow part 2 and the rectangular hollow part 3 of the bin body 1. The sealing part is an automatic lifting door. Functional equipment includes maintenance robot lens cleaning device 8 , air conditioner 9 , power supply 10 , automati...
Embodiment 2
[0036] Such as figure 2 As shown, on the basis of Embodiment 1, the reserved openings 5 can also be arranged on both sides outside the bin body.
Embodiment 3
[0038] The difference from Embodiment 1 is that a maintenance warehouse for bridge overhaul equipment includes a warehouse body 1 with a central hollow part 2 in the middle of the warehouse body 1; 3; A sealing part is installed in cooperation with the central hollow part 2; inside the central hollow part 2. There are wing structures 6 on the left and right sides of the top of the warehouse body 1; the wing structure 6 cooperates with the bridge maintenance track and hangs under the bridge track; the two sides of the upper part of the warehouse body 1 are respectively connected with front wings 14, and the warehouse body 1 is in the front One end of the wing 14; the other end of the front wing 14 is convexly formed with a wing structure 6, and the top of the wing structure 6 is convexly formed with a bump that matches the track; Port 5 is reserved. The sealing part is an automatic lifting door. Functional equipment includes maintenance robot lens cleaning device 8 , air cond...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 


