A fish-passing facility and ecological technology, applied in the ecological environment field of water conservancy and hydropower projects, can solve the problems of small power demand, high operation and maintenance costs, and high construction costs, and achieve the effect of small power drive and water level assurance.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0038] Embodiment 1: adopt a kind of ecological fish passing facility, such as figure 1 with figure 2 In the example, a hoisting passage 3 is provided near the abutment 2 on the backwater side of the barrage 1. The hoisting passage takes the dam body as the main body to establish barriers on both sides, which can be built with the dam body or independently of the outside of the dam body. The lifting channel is used to complete the purpose of assisting the upward tracing of fish, and the fish backtracking is realized through the flood discharge channel or water discharge channel in the dam body. Set fish luring equipment in the semi-enclosed area enclosed by the walls on both sides or form fish luring water flow through continuous water supply. It is usually designed to make the water level of the shallow water in the semi-enclosed area higher than the water level of the water area downstream of the dam body, so as to form a fishway inlet flow from the semi-enclosed area to t...
Embodiment 2
[0046] Embodiment 2: On the basis of Embodiment 1, the way to maintain the water level in the shaft is different. In this embodiment, water is injected into the shaft through a water pump to maintain a high water level in the shaft. In this embodiment, the communication channel 11 may not be provided, and the water pump pumps the upstream water into the shaft.
Embodiment 3
[0047] Embodiment 3: adopt another kind of ecological fish passing facility, such as figure 1 with figure 2 A lifting channel is provided near the abutment on the backwater side of the barrage. The lifting channel takes the dam body as the main body to build barriers on both sides, and fish luring equipment is set in the semi-enclosed area surrounded by the barriers on both sides.
[0048] A closed shaft is arranged on the inner layer of the closed area of the hoisting channel near the dam body. The bottom of the shaft communicates with the upstream waters through a communication channel to maintain a high water level in the shaft. valve.
[0049]A slide rail system is set in the outer shaft wall of the vertical shaft away from the dam body. The slide rail system is provided with a closed traversing chamber 51 inside the shaft wall, and the traversing chamber 51 is matched with a lateral sliding plate 52 . At the same time, vertical track grooves 53 are provided at corres...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com