A top-down shaft construction system and method
A construction method and technology for shafts, which are applied to shaft equipment, well sinking, and earth-moving drilling and mining, etc., can solve problems such as shaft wall collapse, personal safety threats to construction workers, and poor shaft safety.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0049] The following will clearly and completely describe the technical solutions in the embodiments of the present invention with reference to the accompanying drawings in the embodiments of the present invention. Obviously, the described embodiments are only some, not all, embodiments of the present invention. Based on the embodiments of the present invention, all other embodiments obtained by persons of ordinary skill in the art without making creative efforts belong to the protection scope of the present invention.
[0050] In order to enable those skilled in the art to better understand the solution of the present invention, the present invention will be further described in detail below in conjunction with the accompanying drawings and specific embodiments.
[0051] Please refer to Figure 1 to Figure 5 , figure 1 The state diagram during the preliminary construction of the vertical shaft construction system from top to bottom provided for a specific embodiment of the p...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 


