One-key bid adjusting method based on engineering bidding, and terminal
A technology for engineering and bid adjustment, applied in the field of engineering bidding, can solve problems such as error-prone and slow efficiency, and achieve the effect of ensuring rationality and difference, and convenient and quick price adjustment
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0072] Please refer to Figure 1 to Figure 4 , Embodiment 1 of the present invention is:
[0073] One-click bidding method based on project bidding, including steps:
[0074] S1. Obtain the target cost, adjustment parameters, adjustable items, and the minimum price drop rate of the material unit price, and calculate the minimum cost and the lowest price of all adjustable elements when they reach a reasonable minimum value. The adjustable items include multiple adjustable elements;
[0075] In this embodiment, the details are as follows: obtain the target cost, adjustment parameters, adjustable items, and the lowest rate of decrease in the unit price of materials. If the adjustable items include enterprise management fees and profits, the rate of enterprise management fees and profits will be adjusted preferentially until reach a reasonable minimum, such as Figure 4 As shown, the user's target cost is 16,808,976 yuan, and the adjustable items include materials, main material...
Embodiment 2
[0096] Please refer to Figure 5 , the second embodiment of the present invention is:
[0097] The one-key bid adjustment terminal 1 based on project bidding includes a memory 3, a processor 2 and a computer program stored on the memory 3 and operable on the processor 2, and the steps of the first embodiment above are realized when the processor 2 executes the computer program .
[0098] To sum up, the one-click bid adjustment method and terminal based on project bidding provided by the present invention obtains the target cost set by the user, adjustment parameters, adjustable items, and the lowest floating rate of the unit price of materials, taking into account the reasonable minimum value and the user-set The lowest floating rate floats down the adjustable elements to calculate the lowest cost and the lowest price of all adjustable elements when they reach a reasonable minimum value. Fitting and indenting are performed according to the current price and the lowest price i...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com