A hoisting method for the hoisting of separated bridge deck t-beams
A hoisting method and bridge deck technology, which is applied to bridges, bridge construction, erection/assembly of bridges, etc., can solve the problems of increased construction costs, failure to achieve economic goals, waste of manpower, etc., and achieve short construction period, fast and convenient lateral movement The effect of low width and low labor intensity
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0026] The present invention will be further described below in conjunction with accompanying drawing.
[0027] A hoisting method for hoisting T-beams of separated bridge decks, which adopts a traversing truss, and the traversing truss includes a first traversing device 1 and a set The second traversing device 2 on the bridge deck at the same position on the two bridge decks, the first traversing device 1 includes two parallel and horizontally arranged "I"-shaped first bottom beams 11, on the first bottom A plurality of first load-bearing beams 12 perpendicular to the first bottom beam 11 are fixed between the beams 11, and the first load-bearing beams are fixed against the lower surface of the upper flange of the first bottom beam, so that the first bridge The machine track 13 can normally support the bridge erecting machine to walk; the first bridge erecting machine track 13 is provided on the first load-bearing beam 12 along the advancing direction of the first bottom beam ...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 