Looking for breakthrough ideas for innovation challenges? Try Patsnap Eureka!

Pre-reinforcement and excavation construction method for tunnel entrance segment of loess tunnel passing through slip mass

A technology of loess tunnels and construction methods, which is applied in tunnels, earthwork drilling, infrastructure engineering, etc., and can solve problems such as difficult construction, interference, and tunnel structure damage

Active Publication Date: 2020-02-21
CHINA RAILWAY 20 BUREAU GRP
View PDF4 Cites 1 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0006] The construction of the entrance section of the loess tunnel passing through the landslide is very difficult, especially when the entrance section of the tunnel is located in the front of the landslide, the construction difficulty is even greater. After analysis, the main problems are as follows: Inducing the sliding of the landslide body can easily bring safety hazards and interference to the tunnel construction; second, the tunnel entrance (ie, the tunnel entrance) is located at the front edge (ie, the front) of the landslide body, and the infiltration of surface water makes the water content of the new loess higher , the slope of the tunnel entrance and the excavation of the open tunnel cannot guarantee its stability, and landslides are extremely prone to occur; third, when the tunnel dark tunnel passes through the landslide body, it is easy to cause disturbance to the landslide body during the excavation operation, so that the tunnel body is in contact with the landslide Under the interaction of different bodies, dislocation will be generated, which will lead to the destruction of the tunnel structure; fourthly, after the excavation of the tunnel body, the water on both sides of the tunnel body will flow to the tunnel body for discharge. shift

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Pre-reinforcement and excavation construction method for tunnel entrance segment of loess tunnel passing through slip mass
  • Pre-reinforcement and excavation construction method for tunnel entrance segment of loess tunnel passing through slip mass
  • Pre-reinforcement and excavation construction method for tunnel entrance segment of loess tunnel passing through slip mass

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0139] Such as figure 1 Shown a kind of pre-reinforcement and excavation construction method of the loess tunnel entrance section passing through the landslide body, the construction tunnel entrance section 10 is a straight tunnel section passing through the landslide body 1-4 to be treated, and the straight tunnel section The front end of the tunnel is the tunnel entrance 2 and its rear end is the rear end of the entrance section. For details, see figure 2 ; The rear part of the landslide body 1-4 to be controlled is supported above the front part of the upper soil layer 14, and the front part of the upper soil layer 14 is a slide bed positioned at the bottom of the landslide body 1-4 to be controlled, and the landslide body to be controlled is Body 1-4 is the landslide body of the loess landslide and it is a landslide body that slides from back to front on the slide bed; the front and middle parts of the landslide body 1-4 to be treated are all supported on the lower soil l...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

PropertyMeasurementUnit
Layer thicknessaaaaaaaaaa
Login to View More

Abstract

The invention discloses a pre-reinforcement and excavation construction method for a tunnel entrance segment of a loess tunnel passing through a slip mass. The method comprises the following steps offirstly, tunnel body soil layer pre-reinforcement, secondly, tunnel entrance construction of the tunnel, thirdly, excavation and preliminary bracing construction of the reinforced tunnel segment, andfourthly, excavation and preliminary bracing construction of the rear tunnel segment. By means of the method, design is reasonable, construction is simple and convenient, and the use effect is good; before excavation, cemented soil stirring piles are adopted for carrying out reinforcement treatment on the loess stratum of the construction area where the tunnel entrance segment of the tunnel is located in advance, the reinforcement length and reinforcement depth are effectively limited, loose soil of the tunnel body of the tunnel is solidified in advance, it is ensured that the construction process of the tunnel entrance segment of the tunnel passing through the slip mass is safe and reliable, and the structure of the tunnel entrance segment, formed through construction, of the tunnel is stable; and meanwhile, a three-step excavation method is adopted for excavating the tunnel entrance segment of the tunnel, it can be ensured that the excavation process of the tunnel entrance segment ofthe tunnel passing through the slip mass is safe and reliable, and the influence on stability of soil layers around the tunnel is small.

Description

technical field [0001] The invention belongs to the technical field of tunnel construction, and in particular relates to a construction method for pre-reinforcement and excavation of an entrance section of a loess tunnel passing through a landslide body. Background technique [0002] Loess refers to sediments of yellow silt transported by wind during the Quaternary period in the geological era. Loess collapsibility coefficient (also called collapsibility coefficient) is a mechanical parameter to evaluate the collapsibility of loess. Under a certain pressure, loess collapsibility coefficient refers to the ratio of the difference between the height of the soil sample before and after soaking in water and the original height of the soil sample. The collapsibility coefficient of loess is an important index to evaluate the collapsibility of loess, which can be directly measured by experiment. According to the different collapsibility coefficient of loess, loess can be divided in...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
IPC IPC(8): E21D9/14E21D9/00E02D5/46E02D19/10E02D19/08
CPCE02D5/46E02D19/08E02D19/10E21D9/00E21D9/001E21D9/14
Inventor 谢江胜梁永峰刘之涛郭瑞马传明张会安郭尚坤曹运祥王建军申运涛葛亮亮赵卫
Owner CHINA RAILWAY 20 BUREAU GRP
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products