Construction method for stability control of large-section tunnels crossing soil-rock boundary strata
A technology of stability control and construction method, applied in tunnels, earthwork drilling, tunnel lining, etc., can solve problems such as upper soil layer collapse, subsidence, surrounding rock deformation, etc.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0110] Such as figure 1 Shown is a construction method for stability control of a large-section tunnel that crosses the soil-rock boundary stratum, and the cross-section of the tunnel to be constructed is greater than 100m 2 , combined with Figure 7 , the constructed tunnel is located in the earth-rock boundary stratum, and the earth-rock boundary stratum includes the loess layer 3 and the rock layer 4 below the loess layer 3, and the interface between the loess layer 3 and the rock layer 4 is an earth-rock interface; the constructed tunnel The tunnel hole 1 is divided into an upper hole body 1-1, a middle hole body 1-2 and a lower hole body 1-3 from top to bottom. The hole body formed after the step excavation, the middle hole body 1-2 is the hole body formed after the middle step excavation is carried out to the tunnel under construction from the back to the front, and the lower hole body 1-3 is the hole body from the back to the front The tunnel body formed after excavat...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com