A construction method for shield tunneling in water-rich sand layers to pass through existing pipelines at short distances and pass through sewage pipe jacking
A technology for a water-rich sand layer and a construction method, which is applied in earth-moving drilling, underground chambers, and shaft equipment, etc., can solve problems such as affecting normal operation, and achieve significant construction effects, significant social benefits, and good application prospects.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0039] The specific embodiment of the present invention will be further described in conjunction with the accompanying drawings.
[0040] A construction method for shield tunneling in a water-rich sand layer to pass through an existing line and pass through a sewage pipe in a short distance, comprising the following steps:
[0041] S1) Before construction, use MIDAS GTS NX software and FLAC3D numerical simulation to optimize the tunneling plan and determine the unfavorable parts;
[0042] S2) Excavation in the test section, the 50m stratum before crossing is the test section; the test section adjusts and collects various construction parameters, and observes the monitoring situation;
[0043] S3) Shield tunneling construction, the shield tunneling construction process includes:
[0044] 1) Soil pressure control on the excavation face; in order to ensure ground subsidence, maintaining the stability of the excavation face is a prerequisite, and the stability of the excavation f...