Implementation method for distributed task scheduling of automatic marketing system
A distributed task and marketing system technology, applied in the realization field of distributed task scheduling of automated marketing systems, can solve the problems of inability to solve task dependencies, inability to adapt to marketing needs, inability to realize dynamic task combination and real-time adjustment, etc. The effect of increasing flexibility
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0025] An implementation method for distributed task scheduling of an automated marketing system, including Task-Schedule and Task-Executor, wherein the Task-Schedule dynamically maintains the call chain relationship between tasks based on the data structure of the DAG directed acyclic graph, and the Task-Executor realizes the distributed scheduling of execution tasks, which is equipped with a start node, a screening node, a delay node, an execution node and an end node. The specific steps of the implementation method of the distributed task scheduling of the automated marketing system are as follows:
[0026] S1: Task-Schedule triggers task execution, starts to retrieve the start node, and records the execution log;
[0027] S2: Query the execution node after the start node, and assign the executor to call the registered task through the execution strategy to trigger the asynchronous task execution;
[0028] S3: After the task is executed, the executor is notified to proceed ...
Embodiment 2
[0033] An implementation method for distributed task scheduling of an automated marketing system, including Task-Schedule and Task-Executor, wherein the Task-Schedule dynamically maintains the call chain relationship between tasks based on the data structure of the DAG directed acyclic graph, and the Task-Executor realizes the distributed scheduling of execution tasks, which is equipped with a start node, a screening node, a delay node, an execution node and an end node. The specific steps of the implementation method of the distributed task scheduling of the automated marketing system are as follows:
[0034] S1: Task-Schedule triggers task execution, starts to retrieve the start node, and records the execution log;
[0035] S2: Query the execution node after the start node, and assign the executor to call the registered task through the execution strategy to trigger the asynchronous task execution;
[0036] S3: After the task is executed, the executor is notified to proceed ...
PUM

Abstract
Description
Claims
Application Information

- R&D
- Intellectual Property
- Life Sciences
- Materials
- Tech Scout
- Unparalleled Data Quality
- Higher Quality Content
- 60% Fewer Hallucinations
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2025 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com