Problems solved by technology

[0004] Aiming at the deficiencies of the prior art, the present invention provides a method for project cost management, which solves the problem that the existing project cost management proposed in the above background technology is not perfect enough, the control effect on the cost is not obvious, and the bidding The problem of high cost investment in the preparation work

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Project cost management method

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0029] The following will clearly and completely describe the technical solutions in the embodiments of the present invention in conjunction with the specific embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of them.

[0030] A method for project cost management, comprising the following steps:

[0031] (1) Project selection;

[0032] (2) Design of engineering drawings;

[0033] (3) Project bidding;

[0034] (4) Check engineering drawings;

[0035] (5) Optimization of engineering drawings;

[0036] (6) On-site survey and inspection.

[0037] The project cost management method includes the following specific steps:

[0038] (1) Project selection

[0039] Carefully select each reported project, and estimate the project while selecting, and list the corresponding structure type according to the project, including the entire payment process and the basic area of ​​the building;

[0...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention discloses a project cost management method, which relates to the technical field of project cost management, and comprises the following steps: (1) project selection, (2) designing of anengineering drawing, (3) carrying out project bidding, (4) checking the engineering drawing, (5) optimizing an engineering drawing, and (6) carrying out on-site survey and inspection. According to the project cost management method, in the drawing design link, an AB-edition double contract is adopted for drawing up the contract, so that the problems existing in the design process can be clearly standardized, the situation that the design drawing is randomly modified regardless of time is prevented, the design standard is reduced, and the design process is standardized through an A-edition contract, meanwhile, specific design budget cost is stipulated, in addition, a pre-expenditure amount is added to prevent accidents and other problems occurring in other design processes, and the amountof the pre-expenditure amount, a B-edition contract without later contracts, specific items of a design drawing and various standard indexes can be mainly accounted.

Description

technical field [0001] The invention relates to the technical field of engineering cost management, in particular to a cost management method for engineering cost. Background technique [0002] With the rapid development of my country's economy, many industries have been reformed to a large extent, which has greatly promoted the development of new and old industries. Among them, the construction engineering industry has always been the focus of economic development. Construction engineering In the initial stage, it is necessary to carry out project cost, use advanced construction technology and construction plan, and at the same time, have a relatively low project cost plan. In order to better improve project cost management, it is necessary to effectively control the cost management of project cost. [0003] At present, the components of the project cost management are not perfect, the control effect on the cost is not obvious, and the cost investment in the preparation of t...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Applications(China)
IPC IPC(8): G06Q30/02G06Q50/08
CPCG06Q30/0283G06Q50/08
Inventor 林燕弟李梓珊
Owner 广东确正工程咨询有限公司
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products