Bridge tunnel construction supporting equipment
A technology for tunnel construction and support equipment, which is applied to mining equipment, earthwork drilling, temporary shields, etc., and can solve problems such as single support angle
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0027] see Figure 1-6 , a bridge and tunnel construction support equipment, including a supporting plate 1, the middle part of the supporting plate 1 is provided with a chute 5, the left and right sides of the chute 5 are slidably connected to the first slider 6, and the upper part of the first slider 6 is rotatably connected to the second The lower end of a support rod 7, the upper end of the first support rod 7 is rotatably connected to the middle part of the lower surface of the lifting platform 4, the upper surface right side of the supporting plate 1 is provided with a first drive motor 9, and the output shaft of the first drive motor 9 is fixedly connected The right end of the first screw mandrel 8, the left and right sides of the first screw mandrel 8 are threadedly connected to the middle part of the first slide block 6, the left and right sides of the upper surface of the supporting plate 1 are provided with the first fixed plate 10, the first fixed plate 10 The midd...
Embodiment 2
[0031] see image 3 and Figure 4 , the other content of this embodiment is the same as that of Embodiment 1, the difference is that: the first fixed rod 22 and the second fixed rod 25 are respectively rotated to connect the upper and lower sides of the mounting plate 16, and the part of the mounting plate 16 far away from the center of the device One side is detachably connected to the support plate 15 . Since different tunnel constructions require the same support area, in order to improve the utilization rate of the device, an arc-shaped mounting plate 16 is provided in the device, and the mounting plate 16 is detachably connected with the support plate 15, so that the device can be Different support plates 15 are replaced for different construction environments.
[0032] In the implementation process of the present invention, at first determine the position where the top of the tunnel needs to be supported. At this time, start the second drive motor 27, and the second driv...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 


