Anchor tensioning device for integrated pipe pile
An integrated anchor tensioner technology, which is applied to sheet pile walls, buildings, and foundation structure engineering, can solve the problems of difficulty in guaranteeing the quality of concrete pouring, slow construction speed, and high project cost, so as to save concrete, facilitate transportation, and reduce The effect of apportioning costs
Patent Information
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Publication Date
- 2021-03-12
Smart Images

Figure 1 
Figure 2 
Figure 3
Abstract
Description
technical field
[0001] The invention relates to pile foundation technology, in particular to an anchor tensioner for an integrated pipe pile and a construction method for the pipe pile. Background technique
[0002] Large-diameter piles in civil engineering are widely used in the foundations of buildings, bridges, ports and large structures. So far, the construction methods are mostly after drilling holes on site, then inserting steel cages into the pile holes, and pouring concrete on site. This method, under some extreme conditions, is difficult to construct, and the quality of concrete pouring is difficult to guarantee, and the construction speed is also slow. Especially in some karst cave areas, the concrete is easily lost into the soil (rock) cave before it solidifies, causing quality accident. However, for some large-diameter uplift piles, a large number of steel bars need to be configured, and the project cost is high. On the other hand, the core concrete of the larg...
Examples
Embodiment 1
[0056] The first step: At the predetermined position, use mechanical equipment to form holes in the soil of the site to form pile holes;
[0057] Step 2: Assemble the end pressure seat, pile slab and anti-slip restraint ring to form the first section (lowest section) of the annular pile body, and put it into the pile hole;
[0058] Step 3: Adjust the vertical position of the first ring-shaped pile body, and then assemble the pile slab and anti-slip restraint ring to form the second ring-shaped pile body;
[0059] Step 4: Adjust the vertical position of the assembled ring-shaped pile body, and then assemble the pile slab and anti-slip restraint ring to form the third section of ring-shaped pile body, repeating successively until the top elevation of the complete pile body is located on the natural ground When the above position is suitable, install the anchor tensioner, stretch and lock each prefabricated component of the pipe pile to form a whole, and then place the complete r...