Long-time shutdown construction method for water-rich sand layer shield
A construction method and technology of water-rich sand layer, which are applied in earthwork drilling, wellbore lining, tunnel lining, etc., can solve the problems of surface subsidence, shield subsidence, etc., so as to ensure surface subsidence, facilitate recovery construction, and increase soil mass. The effect of stability
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0022] The following clearly and completely describes the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only some of the embodiments of the present invention, but not all of them. Based on the embodiments of the present invention, all other embodiments obtained by persons of ordinary skill in the art without making creative efforts belong to the protection scope of the present invention.
[0023] Such as figure 1 As shown, a long-time shutdown construction method of a water-rich sand layer shield comprises the following steps:
[0024] S1. Pressure setting when the shield machine reaches the stop position;
[0025] S2. Bentonite is injected into the soil bin to increase the stability and flow plasticity of the soil in the soil bin;
[0026] S3, the soil around the shield is injected with bentonite to increase the stability of the soil around the shield;
[0027] S4. Perform secondary supplementary grouting at the t...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com