Offshore immersed pipe and underwater installation and construction method of sewage sea area discharge pipe
A construction method and discharge pipe technology, applied in the direction of pipes/pipe joints/fittings, pipe elements, flange connections, etc., can solve the problems of long mileage and difficult paving process, reduce damage, improve construction efficiency, Guarantee the effect of installation quality
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0041] The present invention will be further described below in conjunction with accompanying drawing.
[0042] see Figure 1 to Figure 8 , the marine immersed pipe and underwater installation and construction method of the sewage sea area discharge pipe of the present invention are used to install successively six sections of 290m long and 2.8m discharge pipes and a discharge head from the sea side to the shore side; the discharge head includes The pipe diameter gradually decreases from the rear 2.8m to the 1.2m diffuser pipe. The length of the diffuser pipe is 94m and it is vertically connected to seven riser pipes with a pipe diameter of 0.8m through tees at intervals. The top of each riser pipe Five duckbill valves are evenly distributed, and the front end of the diffusion pipe is also connected to a flushing pipe with an inclination of 45° and a pipe diameter of 0.8m (see figure 1 ).
[0043] Construction method of the present invention comprises the following steps:
...