Real-time dynamic progress control method and device for project management

A real-time dynamic, progress control technology, applied in office automation, image data processing, data processing applications, etc., can solve problems such as inability to complete projects on time, inability to control project progress, and accurate work progress.

Pending Publication Date: 2021-10-22
CHONGQING COLLEGE OF ELECTRONICS ENG
View PDF0 Cites 0 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

However, spot checks cannot guarantee that all reported work progress is accurate, which means that the real-time construction progress obtained may not match the real progress, and the project progress cannot be regulated in a timely and accurate manner, and may even be lost. Circumstances where the project cannot be completed on time

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Real-time dynamic progress control method and device for project management

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0034] The following is further described in detail through specific implementation methods:

[0035] The embodiment is basically as attached figure 1 Shown: a real-time dynamic progress control method for engineering management, comprising the following steps:

[0036] S1. Obtain the construction schedule, which includes the start time, completion time, and planned workload of each time period; specifically, the construction schedule includes the first schedule with the earliest start time and the second schedule with the latest start time , both the first schedule and the second schedule include the start time, completion time and planned workload in each time period.

[0037] S2. Obtain the total planned resource consumption of the project and the resource consumption speed of constant-speed construction, generate the planned resource consumption, and obtain the planned resource-time curve according to the construction schedule. Specifically, obtain the first planned resou...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention relates to the technical field of project progress management and control, and provides a real-time dynamic progress control method for project management, which comprises the following steps: S1, acquiring a construction progress plan; S2, obtaining the total resource plan consumption amount of the project and the resource consumption speed of the uniform construction, generating the resource plan consumption amount, and obtaining a plan resource-time curve according to the construction progress plan; S3, obtaining the actual construction progress and the actual resource consumption, obtaining an actual resource-time curve, wherein the actual construction progress comprises the construction time and the actual workload; S4, obtaining a predetermined time period, obtaining an actual resource completion rate in the time period from the actual resource-time curve, and obtaining a planned resource completion rate in the time period from the planned resource-time curve; and S5, comparing the obtained actual completion rate of the resources with the planned completion rate of the resources, and sending a first early warning signal when the actual completion rate of the resources is not matched with the planned completion rate of the resources.

Description

technical field [0001] The invention relates to the technical field of project progress management and control, in particular to a real-time dynamic progress control method and device for project management. Background technique [0002] Project schedule management refers to the use of scientific methods to determine schedule objectives, prepare schedule plans and resource supply plans, carry out schedule control, and achieve construction period objectives on the basis of coordination with quality and cost objectives. In the process of implementing the plan, it is often necessary to check whether the real-time construction progress is carried out according to the plan. If there is a deviation, it is necessary to find out the cause in time, take necessary remedial measures or adjust and modify the original plan until the project is completed. In the existing progress management system, when checking the real-time construction progress, the current real-time construction progr...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
IPC IPC(8): G06Q10/10G06T11/20
CPCG06Q10/103G06T11/203
Inventor 李会静邱伟
Owner CHONGQING COLLEGE OF ELECTRONICS ENG
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products