Electric power overhaul task scheduling system

The invention discloses an electric power overhaul task scheduling system, improves the work efficiency of overhaul work, and belongs to the field of electric power overhaul scheduling. The method comprises the steps that each maintenance project corresponds to a maintenance project scheduling sub-control platform and a maintenance group queue, and each maintenance worker corresponds to a handheldterminal; each maintenance group queue stores idle maintenance groups in the current maintenance project according to a time sequence; a main scheduling platform receives a dispatch list, arranges the dispatch list corresponding to each maintenance project according to the maintenance projects and the maintenance time in the dispatch list, and allocates the dispatch list and the arrangement number to the corresponding maintenance project scheduling sub-control platform; the sub-control platform allocates maintenance groups according to the queuing number and the sequence of the current maintenance group queue; the corresponding handheld terminal works according to the received dispatch list; when the handheld terminal of a certain maintenance group sends a maintenance work completion signal, the corresponding maintenance group is added into the maintenance group queue and is located at the tail of the current maintenance group queue.
Owner:黑龙江电力调度实业有限公司 +2

Computer-aided steel grating product information intelligent identification and statistics technology

The invention belongs to the technical field of steel grating processing and production, and particularly relates to a computer-aided steel grating product information intelligent identification and statistics technology. A steel grating is a special customized product, and the number of steel gratings and related parts such as skirting boards and antiskid strips must be evaluated and counted according to a steel structure design drawing or a building construction drawing, Thus, better materal preparation and production organization can be achieved. According to a traditional method, manual recognition and calculation are conducted according to the basic size on a steel structure design drawing or a building construction drawing provided by a client, a statistical table is input, and if drawing size data is missing, guessing can only be conducted. Compared with the traditional method, the method disclosed by the invention has the advantages that the steel grating is directly recognizedon the steel structure design drawing or the building construction drawing provided by a user, necessary components are added according to requirements, the statistical table is automatically generated, and the working efficiency of steel grating evaluation and the statistical accuracy are greatly improved.
Owner:苏州特文思达科技有限公司

Block chain-based distributed system hierarchical processing method and electronic equipment

The embodiment of the invention discloses a block chain-based distributed system hierarchical processing method and electronic equipment. A specific embodiment of the method comprises the steps of obtaining a to-be-processed target data block set and an initial data information set, wherein the initial data information comprises a data type of a target data block and a storage address of the target data block; processing the initial data information set based on the data type to obtain a process data information set; processing the target data block set based on the process data information set; and updating block chain. The method comprises the steps of performing hierarchical division on a to-be-processed target data block set according to data types in the initial information set to obtain a process data information set; and for each process data information group in the process data information group set, the target data block set is respectively processed. By means of the layeredprocessing mode, the processing efficiency of the target data block set processing tasks can be improved, it is guaranteed that all the tasks are completed timely and effectively, and the distributedsystem processing performance based on the block chain is improved.
Owner:齐鲁云商数字科技股份有限公司

Two layer sub-project structure for application classification directory and project data

InactiveCN107545345ARealize business benefitsMore flexibility in resource allocationOffice automationResourcesProject executionResource distribution
The invention discloses a two layer sub-project structure for a application classification directory and project data. The two layer sub-project structure for an application classification directory and project data is characterized in that: a time limit is prescribed; project weights are distributed; and all sub-projects are of a two-layer special structure and exists in a mode of a classification directory and project data; according to a Hall three-dimensional structure, a system project is a three-dimensional spatial structure consisting of a time dimension, a logic dimension and a knowledge dimension. The two layer sub-project structure for the application classification directory and project data divide a system engineering activities into seven stages and seven steps and provide a unified thought method to solving a complex system problem. The two layer sub-project structure for the application classification directory and project data maximizes usage values of important resources, realizes enterprise benefit maximization, and performs deployment in the two-layer subproject. The two layer sub-project structure for the application classified directory and the project data ismore flexible in resource distribution during a project execution process, the resources can be effectively utilized and the project can be timely finished.
Owner:上海金悦软件中心

Environment-friendly tax declaration monitoring management method, device and system

The invention relates to an environmental protection tax declaration monitoring management method, device and system. According to the technical scheme provided by the invention, the tax-related pollutant emission data of the user is acquired from the environmental protection department service system to generate the second environmental protection tax declaration form, and the second environmental protection tax declaration form is compared with the first environmental protection tax declaration form submitted by the user to generate the difference information. The difference information canbe used by a tax administration department for auditing and verifying the first environmental protection tax declaration form submitted by the user, time and labor are saved, the office efficiency ofthe tax administration department is improved, and accurate management of environmental protection tax declaration of an enterprise is achieved. Meanwhile, the difference information can also be usedfor guiding enterprises to declare the environmental protection tax, and the enterprises are assisted to conveniently, timely and accurately complete declaration work of the environmental protection tax. And the difference information can also be used for an environmental protection department to verify whether the acquired tax-related pollutant emission data of the user is correct or not, so thatthe enterprise can be conveniently processed according to a verification result.
Owner:AEROSPACE INFORMATION

Real-time dynamic progress control method and device for project management

The invention relates to the technical field of project progress management and control, and provides a real-time dynamic progress control method for project management, which comprises the following steps: S1, acquiring a construction progress plan; S2, obtaining the total resource plan consumption amount of the project and the resource consumption speed of the uniform construction, generating the resource plan consumption amount, and obtaining a plan resource-time curve according to the construction progress plan; S3, obtaining the actual construction progress and the actual resource consumption, obtaining an actual resource-time curve, wherein the actual construction progress comprises the construction time and the actual workload; S4, obtaining a predetermined time period, obtaining an actual resource completion rate in the time period from the actual resource-time curve, and obtaining a planned resource completion rate in the time period from the planned resource-time curve; and S5, comparing the obtained actual completion rate of the resources with the planned completion rate of the resources, and sending a first early warning signal when the actual completion rate of the resources is not matched with the planned completion rate of the resources.
Owner:CHONGQING COLLEGE OF ELECTRONICS ENG

Memory recovery method and device, storage medium and electronic equipment

PendingCN111831444ARespond to memory allocation requests in a timely mannerImprove memory allocation success rateResource allocationEngineeringReal-time computing
The embodiment of the application discloses a memory recovery method and device, a storage medium and electronic equipment, and the method comprises the steps: determining the idle memory capacity ina memory space when a memory distribution request transmitted by a thread is received, and judging whether the thread is a thread of a preset type or not; when the thread is the thread of the preset type, judging whether the idle memory amount is smaller than a first preset threshold value or not, and when the idle memory amount is smaller than the first preset threshold value, performing memory recovery processing; when the thread is not the thread of the preset type, judging whether the idle memory amount is smaller than a second preset threshold value or not; and if the idle memory amount is smaller than a second preset threshold value, performing memory recovery processing. According to the scheme, the probability that the thread enters the slow allocation path is reduced, so that thememory allocation request of the thread of the preset type can be responded in time, the memory allocation success rate of the thread is improved, then the user interaction event can be completed in time, and jamming in a user interaction scene is avoided.
Owner:GUANGDONG OPPO MOBILE TELECOMM CORP LTD

Method for automatically detecting cascade number of series buses

The invention relates to a communication bus, in particular to a method for automatically detecting the cascade number of serial buses, which comprises the following steps that: a system controller resets built-in counters, first communication ports and second communication ports of all communication nodes; the system controller closes the reset signal, the built-in counter starts counting, and a high-level signal at the communication node at the tail end of the bus is transmitted forwards along the cascaded communication nodes; a communication node built-in counter receiving the high-level signal stops working, and the transmission modes of the first communication port and the second communication port are switched; after the system controller receives the high-level signal, the built-in counters of all the communication nodes are reset; the system controller closes the reset signal, the built-in counter starts counting, and a high-level signal sent by the communication host is reversely transmitted along the cascaded communication nodes; according to the technical scheme provided by the invention, the defects that each communication node cannot accurately and timely judge the cascade quantity and the sorting information of the communication node in the prior art can be overcome.
Owner:合肥甘尧电子科技有限公司
Who we serve
  • R&D Engineer