Liftable flood control embankment and method
A technology of embankments and levees, applied in the field of liftable flood control embankments, which can solve the problems of complex structure, high cost, and high production cost
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0046] Embodiment 1, with reference to Figure 1-3 , a kind of liftable flood control embankment mentioned in the present invention, comprises the river protection embankment a on the left bank, the river beach b on the left bank, the river beach c on the right bank, the river protection embankment d on the right bank, the left water and soil loss prevention dam e, the right water and soil loss prevention dam f, and the river bank The flood discharge channel g and the river bed k are respectively provided with a left water and soil loss prevention dam e and a right water and soil loss prevention dam f on both sides of the river bed k, and a left water and soil loss prevention dam e and a left bank protection embankment a On the left bank beach b, there is a right bank beach c between the right water and soil loss prevention dam f and the right bank moat d, and between the left bank beach b and the river bed k, and between the right bank beach c and the river bed k, respectively...
Embodiment 2
[0061] Embodiment 2, a kind of liftable flood control embankment mentioned in the present invention, includes the left bank protection embankment a, the left bank river bank b, the right bank river bank c, the right bank protection embankment d, the left water and soil loss prevention dam e, and the right water and soil loss prevention dam f, river beach flood discharge channel g and river bed k, the left water and soil loss prevention dam e and the right water and soil loss prevention dam f are respectively arranged on both sides of said river bed k, between the left water and soil loss prevention dam e and the left bank protection embankment a There is a beach b on the left bank, a beach c on the right bank between the water and soil loss prevention dam f on the right bank and the embankment d on the right bank, and a beach c on the left bank between the beach b on the left bank and the river bed k, and between the beach c on the right bank and the river bed k The improvement...
Embodiment 3
[0072]Embodiment 3, a liftable flood control embankment mentioned in the present invention, its technical solution is: including left bank moat a, left bank beach b, right bank river beach c, right bank moat d, left water and soil loss prevention dam e, The right water and soil loss prevention dam f, the river bank flood discharge channel g and the river bed k are respectively provided with the left water and soil loss prevention dam e and the right water and soil loss prevention dam f on both sides of the river bed k, and the left water and soil loss prevention dam e and the left bank There is a beach b on the left bank between the moat embankment a, a beach c on the right bank between the water and soil loss prevention dam f on the right bank and the embankment d on the right bank, and a beach c on the left bank between the beach b on the left bank and the river bed k and between the beach c on the right bank and the river bed k There are river beach flood discharge channels ...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com