Execution method and device of orderly power utilization scheme, equipment and medium

A technology of power consumption scheme and execution method, applied in the field of computer, can solve the problems of large manpower and material resources, low baseline daily accuracy, low work efficiency of orderly power consumption scheme, etc. Effect

Pending Publication Date: 2022-04-12
GUANGDONG POWER GRID CO LTD +1
View PDF0 Cites 0 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

Therefore, it is particularly important to determine the baseline date of the orderly electricity consumption plan. In the current implementation method of the orderly electricity use plan, the baseline date of the orderly electricity use plan is usually determined man

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Execution method and device of orderly power utilization scheme, equipment and medium
  • Execution method and device of orderly power utilization scheme, equipment and medium
  • Execution method and device of orderly power utilization scheme, equipment and medium

Examples

Experimental program
Comparison scheme
Effect test

Embodiment 1

[0030] figure 1 This method can be applied to the case where the proposed baseline day is provided by determining an orderly power supply scheme by determining an orderly-based electricity scheme. The execution device is executed, and the execution device of an orderly power supply can be implemented by software and / or hardware, and can be integrated into an electronic device such as a computer or server.

[0031] Such as figure 1 As shown, the method of this embodiment includes:

[0032] S110 determines the scheme name of each of the ordered power plans, determine the scheme of each orderless power supply program according to each program name.

[0033] Among them, the number of ordered power plans can be one or more. The program name can be understood as an identification name of an orderly power supply scheme. The program name can include field names, scheme types, and scenarios of the program execution date. For example, the name of the program can be the XX Bureau on May 1...

Embodiment 2

[0060] figure 2 It is a schematic flow diagram of a method of executing an ordered power supply scheme according to Embodiment 2 of the present invention, on the basis of the foregoing embodiment, optionally, and the program execution date of each orderless power plan according to various scheme names. Including: For each option name name, the presentation of the program name of the current orderly power supply scheme is transmitted to the predetermined scheme to perform the daily determination method; when the delivery is completed, call the scheme execution date. The determination method determines the program execution date of the current orderly power supply scheme. Among them, the same or corresponding technical terms in the above embodiment will not be described herein.

[0061] Such as figure 2 As shown, the method of this embodiment can specifically include:

[0062] S210, determine the solution name of each organized electricity program.

[0063] S220, for each optional ...

Embodiment 3

[0077] image 3It is a schematic structural diagram of an execution device of an organic power supply scheme according to the first embodiment of the present invention. Day determination module 320.

[0078] Wherein, the scheme is performed, and the scheme of the respective orderly power scheme is used to determine the scheme of each order, determine the scheme execution date of each of the ordered power plans, and the solution baseline day determination module 320 for each The program execution date of an orderly power supply program is determined whether or not the current order execution date is a working day, if it is determined that the current working day of the currently orderly power scheme is performed. And the previous working day is based on the scheme of the current ordered power supply scheme, and the current orderly power supply scheme is performed at the baseline day.

[0079] According to an embodiment of the present invention, the scheme name name of each of the o...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

PUM

No PUM Login to view more

Abstract

The embodiment of the invention discloses an execution method and device of an orderly power utilization scheme, equipment and a medium. The method comprises the following steps: determining a scheme name of each orderly power utilization scheme, and determining a scheme execution day of each orderly power utilization scheme according to each scheme name; aiming at the scheme execution day of each orderly power utilization scheme, judging whether the scheme execution day of the current orderly power utilization scheme is a workday or not, if not, determining a previous workday corresponding to the scheme execution day of the current orderly power utilization scheme, and taking the previous workday as a scheme baseline day of the current orderly power utilization scheme; and executing the current orderly power utilization scheme on the scheme baseline day, thereby solving the technical problem of low baseline day determination accuracy existing in the execution method of the current orderly power utilization scheme baseline day, realizing more accurate and rapid determination of the orderly power utilization scheme baseline day, and executing the orderly power utilization scheme on the orderly power utilization scheme baseline day. Not only is a large amount of manpower and material resources prevented from being consumed, but also the technical effect of improving the working efficiency is achieved.

Description

Technical field [0001] Embodiments of the present invention relate to the field of computer technology, and more particularly to a method, apparatus, apparatus, and medium of an ordered power supply scheme. Background technique [0002] With the rapid development of my country and the continuous improvement of people's living standards, electricity demand has grown rapidly. Any orderly use of electricity as one of the effective means of management of power demand, has become a key to solving the safety peak of the power grid. Therefore, the ocean-based power plan is determined to be particularly important. At present, the orderly power supply plan is currently determined by artificial way in the implementation method of an orderly power supply program, which not only costs a lot of human and material power, but also determines The accuracy of the baseline baseline day is low, resulting in a low work efficiency of the execution of an orderly power supply. Inventive content [000...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

Application Information

Patent Timeline
no application Login to view more
IPC IPC(8): G06Q10/06G06Q50/06G06F16/903
Inventor 许庭威李国君
Owner GUANGDONG POWER GRID CO LTD
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products