Expert extraction encryption method for integrating credit rating of government purchasing experts
An encryption method and expert scoring technology, which is applied in data processing applications, instruments, business, etc., can solve the problems of low review quality, unfair procurement work, etc., and achieve the goal of improving impartiality, improving fairness, and improving review quality Effect
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0030] Embodiment 1 of the present application provides a method such as figure 1 The expert extraction encryption method for integrating government procurement expert credit ratings is shown:
[0031] 1), the purchaser or procurement agency determines the number of experts to be extracted m according to the project information, and calculates the number of times the cycle ends is rounded down;
[0032] 2) Obtain a set of experts who have the qualifications for this review project, and form the expert set L1 as the first step;
[0033] 3) Select the experts whose expert scores are greater than or equal to 90 points from L1, and store them in the expert set L2 as the second step;
[0034] 4), the expert set L1 and the expert set L2 are not removed, and the expert set L3 is obtained by merging;
[0035] 5), obtain m pieces of data from L3 through a random algorithm, store them in the expert set L4 after deduplication, update the number of experts to be extracted m=(the numbe...
Embodiment 2
[0043] On the basis of Embodiment 1, Embodiment 2 of this application provides an expert extraction and encryption method that integrates government procurement expert credit ratings in Embodiment 1:
[0044] Step 1. The purchaser or procurement agency enters the project demand form: the purchaser or procurement agency logs in to the extraction system, and submits the project information (project name, project number, project amount, bid opening time, bid opening address, and bid evaluation experts to be extracted) number, project leader and contact information) into the extraction system, and determine the number m of bid evaluation experts to be extracted according to the project information;
[0045] Step 2. Configure the extraction rules in the extraction system (start time, end time and avoidance conditions for daily extraction), and the extraction system extracts qualified bid evaluation experts according to the extraction rules and puts them into the expert set L1. The n...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 


