37results about How to "Avoid construction difficulties" patented technology

Active fault spanning aseismic structure and construction method thereof

The invention relates to an active fault spanning aseismic structure and a construction method thereof. A damping ring is arranged in the surrounding rock of the lining structure at a fault fracture zone, the lining structure is located in the inner round of the damping ring, and a certain spacing distance exists between the lining structure and the damping ring; left, right and upper sides of thetunnel cross section at the fault fracture zone are expanded relative to the tunnel cross section of the stable section; the lining structure penetrating through the fault fracture zone is of a vertical segmental structure, and two adjacent lining segments are connected through a folded flexible joint in the deformation joint. The damping ring is adopted to weaken the earthquake action, and partsof seismic wave energy is absorbed to consume and reduce the earthquake energy; the whole lining structure is converted to the lining segment from, flexible chaining connection capable of bearing large deformability between the two adjacent lining segments is adopted, so that the staggered displacement is mainly absorbed by the flexible chaining connection, and the earthquake resistance and damping performance of the tunnel structure is improved. According to the structure, earthquake resistance and diastrophism resistance are combined, and the whole safety of a tunnel can be greatly improved.
Owner:SOUTHWEST JIAOTONG UNIV

Method for excavating and supporting subway station tunnel by adopting underground excavation construction channel

The invention discloses a method for excavating and supporting a subway station tunnel by adopting an underground excavation construction channel, relates to the technical field of tunnel construction, and mainly aims to solve the problems of complicated conversion procedures, high risk, high temporary support consumption and the like in a station tunnel construction method. The method comprises the steps of conversion construction of a main construction channel and a station tunnel, conversion construction of an auxiliary construction channel and the station tunnel and excavation support of the station tunnel; the top of the main construction channel is lifted to be flush with an arch crown of the station, and parallel station entering and portal steel arch frame support are adopted; andthe auxiliary construction channel adopts footage from the station tunnel, relates to the station excavation construction step sequence in the range of the conversion section and support at the connection position of the station tunnel and the auxiliary construction channel. The method aims to solve the problems of complicated construction steps, large construction risk of key sections and more temporary supports in the traditional construction method so as to expect the underground station tunnel construction to achieve safer and more efficient purposes.
Owner:ZHONGJIAN SUIDAO CONSTR CO LTD +1

Aluminum dihydrogen phosphate and steel fiber reinforced refractory castable and preparation method

The invention discloses an aluminum dihydrogen phosphate and steel fiber reinforced refractory castable and a preparation method. The aluminum dihydrogen phosphate and steel fiber reinforced refractory castable comprises a main refractory material, an additive and a binding agent; the raw material of the binding agent comprises an aluminum dihydrogen phosphate aqueous solution in mass concentration of 45-50%; thiourea and potassium iodide are dissolved in the aluminum dihydrogen phosphate aqueous solution in mass concentration of 45-50%; the weight of the aluminum dihydrogen phosphate aqueoussolution in mass concentration of 45-50% is 8-12% of total weight of the main refractory material. The aluminum dihydrogen phosphate and steel fiber reinforced refractory castable is adopted for preparing the products, such as a molten iron slagging plate with a carbon steel metal core wrapped with a refractory material; the generation of reaction gas of aluminum dihydrogen phosphate is avoided during the processes of castable preparation and casting molding; water resistance and strength under normal temperature of the casting body are promoted; excellent effects of greatly reducing the timeof casting molding and baking preparation, reducing baking energy consumption and prolonging service life are achieved.
Owner:武汉钢铁有限公司

Method for repairing local crack of concrete beam by using shallow embedded shape memory alloy wire

The invention discloses a method for repairing a local crack of a concrete beam by using a shallow embedded shape memory alloy wire. The method for repairing the local crack of the concrete beam by using the shallow embedded shape memory alloy wire comprises the steps of 1) forming a groove in the concrete beam with the local crack within a protective layer depth range; 2) embedding a shape memory alloy after being stretched to generate pre-strain into the groove; 3) injecting a bonding material into the groove; 4) electrifying and heating the shape memory alloy; and after cooling, using permanent return stress to apply prestress to the concrete beam; and 5) recovering a concrete protective layer to finish reinforcing. According to the method for repairing the local crack of the concrete beam by using the shallow embedded shape memory alloy wire, in the case of not changing the appearance of an original structure, the shape memory alloy is driven to generate the permanent return force as the pre-stress to act upon the local crack of the concrete beam through thermal excitation on the shape memory alloy so that the stress state of the local crack of the concrete beam is improved and the local crack is reduced or closed; and therefore, the bearing capacity and durability of the structure are improved; and meanwhile, limitations such as low pre-stress, difficult anchorage device mounting and poor aesthetic property of a traditional active reinforcing method are avoided.
Owner:DALIAN UNIV OF TECH

Pit-in-pit horizontal supporting structure in deep foundation pit and construction method thereof

The invention relates to the technical field of pit-in-pit supporting structures in deep foundation pits and discloses a pit-in-pit horizontal supporting structure in the deep foundation pit and a construction method of the pit-in-pit horizontal supporting structure. The horizontal supporting structure comprises multiple support piles, waist beams, multiple supporting beams and multiple engineering piles. The support piles are arranged at intervals along one side of a pit in the pit, the waist beams are connected to the support piles respectively, the supporting beams are placed on the two sides of the pit in the pit, and the engineering piles are placed on the two sides in the pit in the pit respectively. One end of each supporting beam is connected to the corresponding waist beam, and the other end of each supporting beam is connected with the engineering pile on the same side. According to the horizontal supporting structure, the engineering piles are used as horizontal force bearing components, the support piles and the engineering piles are connected into a whole through the waist beams and the supporting beams, and soil pressure borne by the support piles can be transmitted to the engineering piles. Therefore, anchor rods do not need to be arranged, cost is saved, the construction period is shortened, and the potential safety hazards caused by difficulty of control over construction quality of the anchor rods can be avoided.
Owner:SHENZHEN GONGKAN GEOTECHN GRP

Fastening clamp for web side formwork of stiffened concrete beam

The invention relates to a fastening clamp for a web side formwork of a stiffened concrete beam. The fastening clamp comprises a plurality of clamp units, wherein each clamp unit consists of a left / right side rod, split bolts, nuts and stop collar rods, grooves are formed in the rod ends of one sides of the left / right side rods, a plurality of holes for threading the split bolts are formed from the middle sections of the left / right side rods to the rod sections on the other sides at an equal interval, the groove rod sections of the left / right side rods are attached to the web side formwork of the stiffened concrete beam, the split bolts are threaded through the middle sections and the tail sections of the left / right side rods, the stop collar rods are arranged on the split bolts at the tail sections in a sleeving way, the nuts of the split bolts in the middle sections of the left / right side rods are tightened, and the web side formwork of the stiffened concrete beam is tightly clamped by the left / right side rods. The fastening clamp has the advantages that the traditional fastening mode of forming the holes in the web of the steel beam and threading the split bolts is replaced by the product, the problems that the inaccurate alignment of formwork holes on the two sides of the beam causes difficult construction and repeated formwork hole forming are effectively solved, and the concrete molding quality is ensured.
Owner:CHINA RAILWAY CONSTR ENG GROUP

Combined concrete rectangular sunk well basin and construction method thereof

The invention relates to a combined concrete rectangular sunk well basin and a construction method thereof. The combined concrete rectangular sunk well basin is formed by enclosing the river channel offshore soil body by an enclosing structure and digging to remove the internal soil body, wherein the enclosing structure is a U-shaped structure defined by a group of rectangular sunk wells which sink section by section respectively; the opening of the U-shaped structure faces the river channel, and the top surface is cast in place with continuous reinforced concrete top plates; two opposite walls of the U-shaped structure are spaced by a pre-cast concrete connecting beam; the bottom surface of the pre-cast concrete connecting beam clings to the bottom surface of the basin; the cavity of the rectangular sunk well is sequentially provided with a rubble layer, a bottom sealing concrete soil layer and a backfill sand layer from bottom to top. The combined concrete rectangular sunk well basin has the advantages of strong structural integrity and good stability, is simple to construct and convenient to operate and implement, does not need investment in special mechanical equipment and dedicated materials, imposes relatively little influence on neighbor buildings and structures during construction, and the like, and can be widely applied to the basin construction of river channels or seas.
Owner:CHINA CONSTR SECOND ENG BUREAU LTD

Connecting node of square steel pipe column, H-shaped steel beam and L-shaped ribbed plate

InactiveCN102359192AAdd out-of-plane deformationSimple structureBuilding constructionsSheet steelButt joint
The invention relates to a connecting node of a square steel pipe column, an H-shaped steel beam and an L-shaped ribbed plate. The node is simple in structure, convenient to construct and is free of affecting to pour concrete in the square steel pipe column. The connecting node comprises the square steel pipe column, the H-shaped steel beam and the L-shaped ribbed plate, wherein two limbs of the L-shaped ribbed plate are respectively in butted joint with the upper flange and the lower flange of the H-shaped steel beam and connected with a wall plate of the square steel pipe column. The width B of the flange of the H-shaped steel beam 1 is twice the sum of the lengths b1 of the limbs of the L-shaped ribbed plate in butted joint with the H-shaped steel beam 1. The square steel pipe column comprises a cold bending rectangular square steel pipe column and a hot rolled square column; and the H-shaped steel beam comprises an H-shaped hot rolled steel beam and an H-shaped welded steel beam. The connecting node of the square steel pipe column, the H-shaped steel beam and the L-shaped ribbed plate in the invention adopts a measure of additionally arranging stiffening ribs outside to replace inner partition plates, and the L-shaped ribbed plate can transfer tension and pressure of the flanges of the beam to the wall of the square steel pipe column, so that the deformation outside a plane of the node is increased. Meanwhile, the problem of construction difficulty in installing the inner partition plates can also be avoided.
Owner:SHENYANG JIANZHU UNIVERSITY

Construction method of building outer wall heat preservation and decoration integrated plate

The invention provides a construction method of a building outer wall heat preservation and decoration integrated plate. The construction method comprises the steps that S110, cement mortar is adoptedfor leveling on a base layer wall surface; S120, a vertical control line and a horizontal control line are popped up on the foundation wall surface; S130, a grid division scheme of the whole outer wall heat preservation and decoration integrated plate and the blanking size of each grid of plate are determined, each grid of plate is cut, and inserting grooves are formed in four side surfaces of each grid of plate; S140, a control line of each grid of plate is popped up, a grid dividing gap is formed in the control line of each grid of plate, and the widths of the grid dividing gaps are equal;S150, the plates are bonded row by row one by one according to the control line of each grid of plates along the horizontal control line and the vertical control line, in the process of bonding the plates one by one, fixing frames are installed in the dividing gaps, are fixed to the foundation wall surface and are inserted into the inserting grooves of the adjacent plates; and S160, caulking strips are embedded into the dividing gaps, and sealant is smeared on the caulking strips. By means of the method, the defects that plate installation is not firm, construction is difficult, and anchoringparts are exposed can be overcome.
Owner:CHINA HUAYE GROUP

Construction method of connection plate mounting connector of single-layer partition board

The invention discloses a construction method of a connection plate mounting connector of a single-layer partition board. The construction method comprises the steps that A, a partition wall board A is hoisted in place, the upper end of the partition wall board A is fixed temporarily through construction measures, and the lower end of the partition wall board A is arranged on a mounting joint; B,a connector is mounted at the upper end of the partition wall board A, a web of the connector is arranged on the top end face of the partition wall board A, then the position of the partition wall board A is adjusted, the mounting joint at the lower end of the partition wall board A is fixed after the position of the partition wall board A is fixed, a lower flange plate of the connector is furtherrotated to be attached to the partition wall board, then a fastening screw A is adopted to penetrate through a fastening hole A to fix the lower flange plate, and the mounting of the partition wall board A is completed; C, a partition wall board B is hoisted in place, after the position is adjusted to be precise, an upper flange plate is rotated to be attached to the wall partition board B closely, then a fastening screw B is adopted to penetrate through a fastening hole B to fix the upper flange plate, then the upper end of the partition wall board B is fixed and provided with a connector, and the mounting of the partition wall board B is completed; and D, the temporary fixing measures at the upper end of the partition wall board A are dismounted, and mounting is completed.
Owner:SICHUAN PROVINCIAL ARCHITECTURAL DESIGN & RES INST

River channel monitoring device and method and computer readable storage medium

The invention provides a river channel monitoring device and method and a computer readable storage medium, belongs to the technical field of river channel management, and solves the technical problem of high cost of an existing river channel monitoring mode. A riverway monitoring device is used for monitoring a plurality of preset detection points provided with water gauges on a riverway and comprises a camera, a holder, an inclinometer and a CPU. The holder and the inclinometer are fixed to the camera, the holder is used for controlling the shooting position of the camera, and the inclinometer is used for detecting the inclination angle of the camera along the Y axis; the video output end of the camera is electrically connected with the input end of the CPU; the information output end of the holder and the information output end of the inclinometer are electrically connected with the input end of the CPU, and the output end of the CPU is electrically connected with the control end of the holder and the control end of the inclinometer; and the CPU controls the inclination angle of the inclinometer and the rotation of the holder, so that the camera performs video data acquisition on a plurality of preset detection points, and the CPU identifies the video data to obtain the water level, flow velocity or flow data of the river channel.
Owner:TIANJIN TIANDY DIGITAL TECH

Household intelligent electricity use micro-network system based on power line carrier technology

InactiveCN105281808AWith temperature detection functionWith overload temperature measurement functionTransmission systemsPower distribution line transmissionElectricityManagement unit
The invention discloses a household intelligent electricity use micro-network system based on the power line carrier technology. The household intelligent electricity use micro-network system comprises an intelligent electricity use management unit, multiple power line carrier interconnected WiFi modules and multiple power line carrier interconnected intelligent sockets, wherein the intelligent electricity use management unit comprises a household power supply main switch and an energy gateway which are sequentially connected, the power line carrier interconnected WiFi modules are connected with the energy gateway through power line carriers, the power line carrier interconnected intelligent sockets are connected with the energy gateway through power line carriers, and the household power supply main switch comprises a faulty arc detection module and a circuit temperature collection module which are connected with the energy gateway. By means of the household intelligent electricity use micro-network system, rewiring is not needed, complete household local network coverage is achieved, and the requirements for intelligent electricity use, safe intelligent electricity use and healthy Internet surfing are met.
Owner:SHANGHAI MUNICIPAL ELECTRIC POWER CO +1

Prefabricated reinforced concrete gate slot unit for rcc dam and construction method of gate slot

The invention discloses a prefabricated reinforced concrete gate slot unit for a rcc dam and a construction method of a gate slot. The construction method comprises the following steps of prefabricating the prefabricated reinforced concrete gate slot unit with a slot and a plug in a factory for prefabrication and pre-burying a joint bar; chiseling a contact surface of the prefabricated reinforcedconcrete gate slot unit and the ground concrete; chiseling a contact surface of the prefabricated reinforced concrete gate slot unit and the second phase concrete; chiseling a contact surface of newand old concrete; hoisting the prefabricated reinforced concrete gate slot unit on-site; carrying out layer-by-layer construction to grind concrete; hoisting the upper-layer prefabricated reinforced concrete gate slot unit, and carrying out layer-by-layer construction to grind concrete to a design elevation; and pouring the second phase concrete in a later period and mounting a metal structural part. The construction method avoids defects that it is hard to pour concrete on-site and it is slow to pour the concrete. A socket and spigot joint prefabricated part is quick to construct and construction of the socket and spigot joint prefabricated part and construction of grinding the concrete can be carried out synchronously, so that the construction period of the rcc dam is guaranteed.
Owner:CHINA WATER RESOURCES BEIFANG INVESTIGATION DESIGN & RES

Cordwood temporary support base structure and construction method thereof

The invention discloses a cordwood temporary support base structure. The structure comprises a beam body, a bridge pier and a support base unit, a rectangular support base unit is assembled from two A standard blocks and a B standard block, and the inclined planes of two sides of the cross section of B standard block are attached to the inclined plane of the upper A standard block and the inclined plane of the lower A standard block respectively; beam body connecting bolts are arranged in a vertical unthreaded hole of the A standard block which is located above the B standard block in a penetrating mode, and fixing nuts which are connected to the beam body connecting bolts in a threaded mode are arranged in bolt grooves; the beam body connecting bolts are upwards and fixedly connected with the beam body, and bridge pier connecting bolts are downwards and fixedly connected with the bridge pier; the beam body and the bridge pier are fixedly and integrally connected through a plurality of support base units. The invention further discloses a construction method of the cordwood temporary support base structure. The disassembling efficiency of the temporary support base is greatly improved compared with the prior art, and the construction period is shortened; no waste generates after the temporary support base is disassembled, the environment is not polluted, and the use cost is saved.
Owner:ZHENGZHOU MUNICIPAL ENG CORP

Multi-layer loop multi-flame hole flameless ceramic burner and using method thereof

ActiveCN103866071BAvoid bulkyAvoid loss of structural strengthBlast furnace detailsHeating stovesCombustorHeat load
The invention relates to a multi-layer circuit and multi-burner port flameless ceramic burner. 1-3 sets of burners are combined and installed at the upper part of a top combustion stove when the multi-layer circuit and multi-burner port flameless ceramic burner is used; an upper gas circuit, a middle air circuit and a lower gas circuit, which are sequentially communicated with an upper gas inlet, a middle air inlet and a lower gas inlet are distributed inside the stove wall from top to bottom; an upper burner port layer and a lower burner port layer are arranged on the inner wall of the stove wall; burner port rings are evenly distributed; gas nozzles are respectively formed in the lower part of the upper gas circuit and the upper part of the lower gas circuit; air nozzles are respectively formed at the top side and the bottom side of the middle air circuit; the air and the gas respectively enter upper and lower mixed channels inside respective circuits through corresponding nozzles, and then eject through the burner ports to burn. Control of the burner is as follows: combustion heat load distribution from an upper burner port layer to a lower burner port layer is sequentially reduced, and the excessive coefficients of combustion air are sequentially increased. The air and gas inlets of the burner and the circuits are interconvertible in position, and the multi-layer circuit and multi-burner port flameless ceramic burner is applicable to various top combustion stoves.
Owner:WUHAN UNIV OF SCI & TECH
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products