Method for structural unloading in construction
A technology of building construction and support structure, applied in building construction, construction, building maintenance and other directions, can solve the problems of difficult to control the degree of unloading, large number of supports, huge construction difficulty, etc., and achieve obvious economic effects.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0030] Referring to Fig. 1 to Fig. 7, it is the application of the unloading and loading method of the present invention in floor reconstruction.
[0031] In a comprehensive office building, due to the need to change the use function of the floors, it is necessary to remove the column 4 to be pulled out on the third floor below 11.3m in elevation (as shown in Figure 2), and remove the column 4 below 16.1m in elevation (as shown in Figure 3 ), the beams and slabs on the second floor are removed, so that the hall part of the floor forms a column-free space. After the column 4 to be pulled is removed, the span of the beam increases to a maximum of 15.4 meters. The original structural force system has been greatly changed. Before the column 4 to be pulled is removed, the corresponding beam or other columns must be reinforced. The characteristics of this embodiment are that there are many layers (3 floors) of columns to be pulled out, and the number of columns to be pulled out is m...
Embodiment 2
[0035] As shown in Figure 7, this project also encountered problems in the setting of one of the lower lifting points. The section of the shaft column is irregular and polygonal, and there is a slanted beam at the lifting point that makes it impossible for the sling to pass through. The position is transferred from the lower opening of the beam to the slab surface. When setting the lifting point, the steel beam is used to correct the column section, and then the upper and lower composite beams are connected by the transfer device, which successfully solves this problem. Other settings in this embodiment are the same as those in Embodiment 1.
Embodiment 3
[0037] As shown in Figure 8, the reconstruction and reinforcement project of a large electrical room of a company, the reconstruction part is the gate of the large electrical room. The width of the doorway was changed from 8000mm to 10000mm; each side was widened by 1000mm, but the height of the bottom of the door lintel 18 could not be reduced. Moreover, the original doorway could be used at any time because the workshop could not stop production during the construction period. Due to the large span of the newly remodeled door opening, a steel column is supported in the upper part of the beam. In order to increase the long-term use safety of the door opening, this plan specially adds prestressed diagonal tie rods to unload and strengthen the door beam. Construction status: set steel backing plate connection at the top of the column and about one-third of the span of the door lintel. Use the prestressed oblique rods to unload part of the load generated by the upper steel colum...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More - R&D
- Intellectual Property
- Life Sciences
- Materials
- Tech Scout
- Unparalleled Data Quality
- Higher Quality Content
- 60% Fewer Hallucinations
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2025 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com