Abstract
Description
technical field
[0001] The invention belongs to the technical field of building construction, and relates to a design and construction method of an underground building, in particular to an underground building exterior wall which is prefabricated on the ground and prestressed by a post-tensioning method. A construction method for constructing deep and large underground structures in conjunction with the semi-upside-down method. Background technique
[0002] For the exterior walls of underground buildings that are prefabricated on the ground as a whole, the current prior art mainly uses the jet caisson method to construct the foundation pit enclosure structure. The specific method is: set the caisson blade foot at the bottom of the reinforced concrete caisson wall prefabricated on the ground, the blade foot is made of steel or reinforced concrete, and the outer side of the bottom corner of the outer wall protrudes outward, wider than the outer wall body . When prefabricati...