Construction method of shotcrete support for water contained loess geological tunnel
A technology of shotcrete and construction method, which is applied in underground chambers, earthwork drilling, shaft equipment and other directions to achieve the effects of improving compactness, preventing overall settlement, and improving overall stability
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment
[0031] A. Carry out the pipe shed construction step on the said cave body, install a steel arch frame under the pipe shed position after construction, drill a number of pipe shed pipe holes at the pipe shed position, and punch a number of pipe shed pipe holes on the pipe shed pipe wall in advance. Small holes, and the pipe shed pipe filled with water-absorbing agent is inserted into the pipe hole, and the end of the pipe shed pipe is welded with the steel arch frame. For each construction of 5~9 steel arch frames, a group of pipe shed pipes is constructed. Form the upper arch excavation temporary support stress system;
[0032] The pipe shed method or the umbrella arch method is a super-strong support structure for shallow buried underground excavation in underground structural engineering. Its essence is to pre-drill holes and install thick-walled steel pipes with large moments of inertia on the buried arc of the lining arch ring of the underground tunnel to be excavated or s...
Embodiment 2
[0051] Embodiment two, such as Figure 1~4 Shown:
[0052] Ⅰ. Excavation of the upper arc-shaped pilot pit, generally 0.5m, and timely construction of the initial support of the arch;
[0053] Ⅱ. The arch part is hung with steel mesh, and the steel arch frame is erected, and the concrete is first sprayed;
[0054] Ⅲ. Excavate the core soil, install the system anchor rod, and spray the concrete twice to the standard;
[0055] Ⅳ. Waist excavation (excavation at the left and right vaults, length 2-3m);
[0056] Ⅴ. The waist arch wall is hung with steel mesh, the steel arch is erected, and the anchor is shotcrete;
[0057] Ⅵ. Inverted arch excavation (excavation at the left and right vaults, length 2-3m);
[0058] Ⅶ. Inverted arches are hung with steel mesh, steel arches are erected, and concrete is sprayed;
[0059] Ⅷ. Inverted arch filling, concrete molding;
[0060] Ⅸ. The secondary concrete molded lining of the arch wall.
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com