Building long-stroke redescending-free multi-point synchronous jacking method
A technology of simultaneous jacking and building, applied in building construction, construction, building maintenance, etc., can solve problems such as loss, building structural damage, building damage, etc., to achieve the effect of ensuring safety
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0032] To sum up, the present invention discloses a multi-point synchronous jacking method for long-distance buildings without falling back, which includes the following steps: The key innovation of the present invention compared with the prior art lies in its jacking method and the jacking method used. The equipment, namely the short-stroke mechanical self-locking jack 2, specifically includes the following steps:
[0033](1) Foundation treatment: Reinforce the foundation around the building and set up lower support points; including pile foundation construction within 0.5-1.5 meters around the building. The poured pile caps and cap beams are used as the lower support points, and the top surfaces of all pile caps and cap beams are located in the same horizontal plane, and the top surfaces of the pile caps and cap beams are 0.5- 1.2 meters. The pile foundation that the present invention adopts is bored cast-in-place pile or static pressure pile, pile foundation is used as the...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com