Method for informing frequency range switching, method and device for switching frequency range, and system
A technology for communication equipment and frequency bands, which is applied in wireless communication, network traffic/resource management, electrical components, etc., and can solve problems such as affecting the accurate reception of migration signaling, inability to exit the leased frequency band on time, and signal interference from the second system.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0072] Step 1: The control unit of the unlicensed system obtains the time regularity information of the blank frequency band of the authorized system through intelligent learning, including the time when the blank frequency band appears (that is, the time when the licensed system does not use the licensed frequency band), and the duration segment and other information.
[0073] Step 2: The control unit predicts or calculates the time when the blank frequency band will cease to be used (that is, the starting time when the licensed frequency band is used by the authorized system), and determines the switching activation time according to the time. At the same time, the control unit also needs to decide the target frequency band to which the frequency band should be migrated after returning the frequency band. The control unit sends the switching activation time and target frequency band information to all devices in the unlicensed system in advance.
[0074] Step 3: The devices...
Embodiment 2
[0087] Step 1: The control unit of the unlicensed system accesses the database to obtain the time regularity information of the white space frequency band of the authorized system, including the time when the white space band appears (that is, the time when the licensed system does not use the licensed frequency band), the duration, etc. information.
[0088] Step 2: The control unit predicts or calculates the time when the blank frequency band will cease to be used (that is, the starting time when the licensed frequency band is used by the authorized system), and determines the switching activation time according to the time. At the same time, the control unit also needs to decide the target frequency band to which the frequency band should be migrated after returning the frequency band. The control unit sends the switching activation time and target frequency band information to all devices in the unlicensed system in advance.
[0089]Step 3: The devices in the unlicensed s...
PUM

Abstract
Description
Claims
Application Information

- R&D
- Intellectual Property
- Life Sciences
- Materials
- Tech Scout
- Unparalleled Data Quality
- Higher Quality Content
- 60% Fewer Hallucinations
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2025 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com