[0024] Below, the present invention will be further described in detail by taking the basement construction of a civil construction project as an example. The following examples can enable those skilled in the art to understand the present invention more comprehensively, but do not limit the present invention in any way.
[0025] Such as figure 1 As shown, the construction process of a basement in a civil construction project is as follows: cushion construction→base plate reinforcement binding→base plate formwork installation→base plate concrete pouring→wall reinforcement binding→wall formwork installation→wall concrete pouring→making concrete prefabricated cover 2→vertical Install the concrete prefabricated cover plate 2 on the outer side of the post-casting belt 1 → do waterproofing → backfill soil → pour the vertical post-casting belt 1 of the outer wall after meeting the conditions.
[0026] (1) Before the construction of the cushion layer, pull the long line at the mortar...