Annular post-grouting device for lower pile tips under sandstone geological conditions
A technology of geological conditions and grouting devices, which is applied in construction, infrastructure engineering, etc., can solve problems such as the failure of grouting devices to be inserted, and achieve the effects of ensuring quality success rate, simple structure, and uniform distribution of grouting
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment
[0022] A project in Lanzhou is a landmark building in Lanzhou and even the entire Northwest region. The height of the main building is 250m, which is the tallest building in the Northwest region. The deepest excavation depth is 23.6m, and it is also the deepest foundation pit in the Northwest region. The sandstone of this project is distributed all over the site, and it was not revealed during the geotechnical investigation. The elevation of the cast-in-situ piles of this project is located in the sandstone layer.
[0023] Two grouting pipes are installed on each pile, and the lower part is connected to the annular grouting device of the present invention. It has been proved by engineering practice that the post-grouting annular grouting device of the present invention under sandstone geological conditions well reflects the structure is simple, The construction is convenient. The success rate of grouting in the whole construction process reaches 100%. The grouting quality of ea...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com