A public network pre-data collection method
A technology of data collection and public network, which is applied in fault locations, signal transmission systems, instruments, etc., can solve the problems of high overhead line erection, construction and maintenance costs in difficult mountainous areas, so as to save construction and maintenance costs and ensure power supply reliability , easy to set up effect
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0034] figure 1 The schematic diagram of public network front-end data collection provided by the present invention is shown in the figure: a public network front-end data collection method provided by the present invention includes a power distribution automation platform, a public network front-end server 1, and a remote wireless fault indicator 2. Overhead power distribution lines, data communication concentrator 3 and reverse physical isolation device; the public network front-end server and remote wireless fault indicator transmit data through the data communication concentrator, and the fault information and The real-time collection and monitoring of telemetry information specifically includes the following steps:
[0035] S1: Detect the fault information and telemetry information in the overhead distribution line through the remote wireless fault indicator, and send the collected fault information and telemetry information to the front-end server of the public network t...
Embodiment 2
[0056] The present invention will be further described below in conjunction with the accompanying drawings.
[0057] Such as figure 1 Shown is a public network front-end data acquisition technology, which is based on the public network communication front-end processor and supporting equipment, and receives the wireless fault indicator data of the distribution network overhead line through the public network wireless and access dedicated lines to realize the reception of uploaded information deal with. The specific data collection process is as follows: the main station communicates with the off-station data concentrator through GPRS, the off-station data concentrator is responsible for collecting the data of the fault indicator in a certain section of the line, and the fault indicator is responsible for detecting large current faults and faults in the line. Even harmonic components in the line, and when a large current fault occurs, actively transmit the fault data in the li...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com