Power control method and device
A technology for power control and transmit power, applied in the field of power control methods and equipment
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0080] Such as Figure 5a As shown, in subframe i, CC1 corresponds to the maximum transmit power of the carrier applied to the uplink channel on CC1 The maximum transmit power of the carrier applied to the uplink channel on CC2 corresponding to CC2 need to satisfy P CMAX_L,c ≤P H CMAX,c ≤P CMAX_H,c , the maximum transmit power of the terminal applied to the uplink channel Need to meet P CMAX_L_CA ≤P H CMAX ≤P CMAX_H_CA ; The maximum transmit power of the carrier applied to the SRS on CC1 corresponding to CC1 Need to meet P CMAX_L,c ≤P S CMAX,c ≤P CMAX_H,c , the maximum transmit power of the terminal applied to the SRS Need to meet P CMAX_L_CA ≤P S CMAX ≤P CMAX_H_CA ,in:
[0081] 1) Intra-band CA:
[0082] for P H CMAX,c ,
[0083] P CMAX_L,c =MIN{P EMAX,c -ΔT C,c ,P PowerClass -MAX(MPR c +A-MPR c ,P-MPR c )-ΔT C,c};
[0084] P CMAX_H,c =MIN{P EMAX,c ,P PowerClass};
[0085] for P H CMAX ,
[0086] P CMAX_L_CA =MIN{10log 10 Σp EMAX...
Embodiment 2
[0106] Such as Figure 5b As shown, in subframe i, the MPR, A-MPR and and as well as The determination method is the same as that in Embodiment 1; for SRS2 on CC2, in intra-band CA, its Corresponding to SRS The MPR of A-MPR is determined according to the total transmission bandwidth of PUCCH-1 / PUSCH-1 and SRS2 and the highest modulation order, and the A-MPR is determined according to the total transmission bandwidth of PUCCH-1 / PUSCH-1 and SRS2 and the starting position of RB on each carrier Determined, the remaining calculation steps and methods are the same as in Embodiment 1; when inter-band CA, its The corresponding MPR2 is determined according to the transmission bandwidth and modulation order of SRS2, A-MPR 2 According to the transmission bandwidth of SRS2 and the starting position of RB, the P S CMAX Based on the corresponding parameters of CC2, such as the MPR corresponding to SRS1 1 、A-MPR 1 And the corresponding parameters of CC1 with overlapping transm...
Embodiment 3
[0108] Such as Figure 5c As shown, in subframe i, the uplink channel on CC1 Corresponding to the uplink channel In Intra-band and inter-band CA, its MPR is only determined according to the transmission bandwidth and modulation order of PUCCH-1 / PUSCH-1, and A-MPR is determined according to the transmission bandwidth of PUCCH-1 / PUSCH-1 and the starting RB The position is determined without considering information such as SRS transmission bandwidth, RB allocation, modulation order, etc., and the rest of the calculation steps and methods are the same as in Embodiment 1; the SRS2 in subframe i and the corresponding SRS The determination method is the same as that in Embodiment 2.
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 