Coil synchronous ejection device and coil demoulding method thereof
A technology of ejecting device and coil, applied in coil manufacturing and other directions, can solve problems such as poor synchronization performance, and achieve the effects of smooth and safe demoulding, cost reduction, and quick and convenient operation.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0041] Please refer to Figure 4 , this embodiment uses the above-mentioned coil synchronous ejector device to demould the coil in the mold, which specifically includes the following steps:
[0042] First, a first annular groove 91 or a first annular protrusion (not shown) is provided along the inner wall of the coil inner mold 9, and a second annular groove 101 or a second annular protrusion is provided along the outer wall of the coil outer mold 10. (not shown);
[0043] Then, the second movable block 51 is pressed against the coil 8 and the coil inner mold 9 at the same time, and the first movable block 41 is put into the second annular groove 101 on the coil outer mold 10 or the second annular protrusion. Below; after the second movable block 51 presses the coil 8 and the coil inner mold 9 at the same time, install the sleeve 7 of the same height on all the guide shafts 3 on the inner synchronous ring 5 to press the inner synchronous ring 5, and then Install the nut 11 o...
Embodiment 2
[0047] In this embodiment, the above-mentioned coil synchronous ejection device is used to demould the coil in the mold, which specifically includes the following steps:
[0048] First, a first annular groove 91 or a first annular protrusion is provided along the inner wall of the coil inner mold 9, and a second annular groove 101 or a second annular protrusion is provided along the outer wall of the coil outer mold 10;
[0049] Next, press the first movable block 41 against the coil 8 and the coil outer mold 10 at the same time, and put the second movable block 51 into the first annular groove 91 of the coil inner mold 9 or below the first annular protrusion After the first movable block 41 presses the coil 8 and the coil outer mold 10 at the same time, install sleeves 7 of the same height on all the guide shafts 3 with the outer synchronous ring 4 to press the outer synchronous ring 4, and then guide Install the nut 11 on the end of the shaft 3 to compress the sleeve 7; plac...