The Method of Establishing Reasonable Partial Pressure Point in Water Injection Station Partial Pressure Transformation
A pressure-dividing point and reasonable technology, applied in the direction of earthwork drilling, wellbore/well components, production fluid, etc., can solve the problems of low system efficiency, no solid theoretical basis and sufficient demonstration, and large difference between high and low
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
specific Embodiment
[0079] 1. The method of establishing a reasonable partial pressure point for the technical transformation of water injection station with partial pressure and energy saving
[0080] (1) Calculate the minimum useful power output of the water injection station in the partial pressure water injection scheme of each hypothetical partial pressure point
[0081] 1. Calculation of the required water injection pressure of each water injection well
[0082] The Shengjiu Water Injection Station boosts the pressure of the sewage treated by the Tuo-2 Combined Station to 13.5MPa through a high-pressure centrifugal pump and then transports it to each water distribution well, which is then distributed to each single well (such as figure 1 ). Among them, each (branch) trunk line and single-well pipeline have pipe network loss, and there is valve control loss in the water distribution room. In order to facilitate the study of the problem, starting from the source, the pump pressure of the w...