Method for performing deep foundation pit waterproof curtain construction by adopting high-pressure jet grouting pile machine
A technology of high-pressure rotary jetting pile machine and water-stop curtain, which is applied in the direction of foundation structure engineering, sheet pile wall, construction, etc. , the increase of construction costs and other problems, to achieve the effect of optimizing construction technical parameters, shortening construction period and improving construction quality
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0037] Use the following methods to construct the water-stop curtain for the above-mentioned deep foundation pit:
[0038] (1) Modification of rotary grouting pile machine
[0039] The CFG pile driver is refitted into a high-pressure rotary grouting pile driver. The modification method is to install the grouting pipe and the gas injection pipe inside the drill pipe of the CFG pile driver. The specific installation method is to remove the drill pipe of the CFG pile driver in sections; The tops of the grouting pipe and the air injection pipe are respectively connected with the high-pressure mud pump and the air compressor, and then the grouting pipe and the air injection pipe are passed through each section of the drill pipe in turn, and the grouting pipe and the air injection pipe are passed through each section of the drill pipe at the same time. The gas injection pipe is fixed and welded at the end of each section of drill pipe with steel hoops. Using the above method, the d...
Embodiment 2
[0053] Use the following methods to construct the water-stop curtain for the above-mentioned deep foundation pit:
[0054] (1) Modification of rotary grouting pile machine
[0055] The CFG pile driver is refitted into a high-pressure rotary grouting pile driver. The modification method is to install the grouting pipe and the gas injection pipe inside the drill pipe of the CFG pile driver. The specific installation method is to remove the drill pipe of the CFG pile driver in sections; The tops of the grouting pipe and the air injection pipe are respectively connected with the high-pressure mud pump and the air compressor, and then the grouting pipe and the air injection pipe are passed through each section of the drill pipe in turn, and the grouting pipe and the air injection pipe are passed through each section of the drill pipe at the same time. The gas injection pipe is fixed and welded at the end of each section of drill pipe with steel hoops. Using the above method, the d...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com