A system for home design and acceptance, and a method for home design and acceptance
A home design and equipment technology, applied in computing, special data processing applications, instruments, etc., can solve the problems of low efficiency in design and acceptance, achieve the effect of reducing manual workload and improving work efficiency
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0019] figure 1 A specific structural block diagram of the home design and acceptance system provided by Embodiment 1 of the present invention is shown. For the convenience of description, only the parts related to the embodiment of the present invention are shown. In this embodiment, the home design and acceptance system includes: a project establishment unit 11 , a house type acquisition unit 12 , a home design unit 13 , a cost calculation unit 14 , a home inspection unit 15 and a design review unit 16 .
[0020] Among them, the project establishment unit 11 is used to establish a home system project, preset various functional systems, and the functional systems include various wires, equipment, air channels and water channels;
[0021] Specifically, the wires include weak current control wires and strong current control wires. Device information includes model, specification, and price. After a project is created, it can be viewed anytime, anywhere.
[0022] The house ty...
Embodiment 2
[0034] figure 2 It shows the implementation flow of the home design and acceptance method provided by Embodiment 2 of the present invention, and is described in detail as follows:
[0035] In step S201, a home system project is established, and various functional systems are preset, and the functional systems include various wires and equipment.
[0036] In step S202, receive the flat floor plan of the home, and obtain the floor model map. The floor plan of the home includes layers of ground, wall, roof and mixed size ratios.
[0037] In step S203, the selected functional system is set in the house type model diagram according to customer requirements.
[0038] Wherein, a preferred solution is to calculate the cost of the home system according to the selected functional system.
[0039] In step S204, the construction process nodes and equipment pictures are received, and the content of the house type model picture is compared with the content of the picture for acceptance. ...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 

