A sandy soil greening construction method
A construction method and technology for sand and soil, applied in chemical instruments and methods, land preparation methods, botanical equipment and methods, etc., can solve the problems of not being able to fundamentally fix sand, easily eroded by strong winds, and water loss, and achieve good bonding strength. and structural stability, beneficial to metabolism, and the effect of increasing the bonding force
Patent Information
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Publication Date
- 2019-02-01
Abstract
Description
technical field
[0001] The invention relates to the technical field of environmental protection engineering, in particular to a sandy soil greening construction method suitable for desert areas. Background technique
[0002] Land desertification is an ecological environment problem caused by land degradation caused by human activities. China is one of the countries most seriously affected by desertification. In 1999, the area of desertified land in my country reached 267.4 square kilometers, accounting for 27.9% of the total land area of the country. %, and is still expanding at a rate of 3140 square kilometers every year. Among them, the area of wind-eroded desertification is 187.3 square kilometers, accounting for 70% of the total desertified land area, manifested as desertification of farmland and grassland, mainly located in the arid and semi-arid areas of Northwest China, such as Inner Mongolia, Xinjiang, Gansu, Ningxia, and northern Shaanxi. In the arid and semi-...
Examples
Embodiment 1
[0038] A sandy soil greening construction method, comprising the following steps:
[0039] a, sodium carboxymethyl cellulose, anionic polyacrylamide, ferrous chloride and water are configured as a curing agent;
[0040] b. Mix the curing agent with sand to form solidified sand, pile the solidified sand on the ground with plastic cloth, and cover the surface of the solidified sand with plastic cloth;
[0041] c. Dig out deep pits for planting trees and shallow ditches for planting grass in the sand. The length and width of the deep pits are greater than 30cm, and the depth of the deep pits is 20cm. The width of the shallow ditch is the same as the width of the deep pit, and the depth of the shallow ditch 15cm, a piston is detachably connected to the water collection funnel, drill the water collection funnel into the deep pit, and then fill the solidified sand into the deep pit and shallow ditch, and the solidified sand will form a deep pit in the deep pit to fix sand and absorb...
Embodiment 2
[0049] A sandy soil greening construction method, comprising the following steps:
[0050] a, sodium carboxymethyl cellulose, anionic polyacrylamide, ferrous chloride and water are configured as a curing agent;
[0051] b. Mix the curing agent with sand to form solidified sand, pile the solidified sand on the ground with plastic cloth, and cover the surface of the solidified sand with plastic cloth;
[0052] c. Dig out deep pits for planting trees and shallow ditches for planting grass in the sand. The length and width of the deep pits are greater than 30cm, and the depth of the deep pits is 20cm. The width of the shallow ditch is the same as the width of the deep pit, and the depth of the shallow ditch It is 16cm, and a piston is detachably connected to the water collection funnel, and the water collection funnel is drilled into the deep pit, and then the solidified sand is filled into the deep pit and shallow ditch, and the solidified sand forms a deep pit in the deep pit to...
Embodiment 3
[0061] A sandy soil greening construction method, comprising the following steps:
[0062] a, sodium carboxymethyl cellulose, anionic polyacrylamide, ferrous chloride and water are configured as a curing agent;
[0063] b. Mix the curing agent with sand to form solidified sand, pile the solidified sand on the ground with plastic cloth, and cover the surface of the solidified sand with plastic cloth;
[0064] c. Dig out deep pits for planting trees and shallow ditches for planting grass in the sand. The length and width of the deep pits are greater than 30cm, and the depth of the deep pits is 20cm. The width of the shallow ditch is the same as the width of the deep pit, and the depth of the shallow ditch It is 17cm, and a piston is detachably connected to the water collection funnel, and the water collection funnel is drilled into the deep pit, and then the solidified sand is filled into the deep pit and shallow ditch, and the solidified sand forms a deep pit in the deep pit to...