[0018] The present invention will be further elaborated below by describing a preferred specific embodiment in detail in conjunction with the accompanying drawings.
[0019] Such as figure 1 As shown, a 35~220kV power grid maintenance mode N-1 distribution network structure without load loss, which includes: the first 220 kV power source 1 and the second 220 kV power source 2; the first three-phase transformer 3, the input terminal Connect the output end of the first 220 kV power supply, its first output end is connected to a 110kV bus, its second output end is connected to a 35kV bus; the second three-phase transformer 4, its input end is connected to the second 220 The output end of the kV power supply, its first output end is connected to the described 110kV busbar, and its second output end is connected to the described 35kV busbar; Between the first output end of the three-phase transformer 3 and the first output end of the second three-phase transformer 4; the second se...