Bottleneck Equipment Identification Method in Multi-objective Job Scheduling Based on Fuzzy Hierarchy Analysis
A fuzzy analysis hierarchy process and equipment identification technology, applied in the direction of comprehensive factory control, electrical program control, comprehensive factory control, etc., can solve the problem that there is no effective method for the identification of bottleneck equipment in the workshop
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0047] see figure 1 and figure 2 As shown, a method for identifying bottleneck equipment in multi-objective job scheduling based on fuzzy hierarchical analysis of the present invention comprises the following steps:
[0048] (1) Create a hierarchical bottleneck equipment identification model
[0049] The multi-objective job shop bottleneck identification problem includes bottlenecks, multiple operation targets, each processing equipment, workpiece, each workpiece process route, and multiple elements of processing time. By analyzing the dominant relationship between each element, a hierarchical bottleneck identification model is established. as attached figure 2 shown.
[0050] In the figure, the identification of bottleneck equipment is the overall decision-making goal, so it is divided into the target layer in AHP; the bottleneck equipment drifts with the type and number of operation objectives, so each operation objective of the workshop is divided into the criterion la...