Index fast estimation method and system
An index and fast technology, applied in the direction of calculation, instrumentation, data processing applications, etc., can solve problems such as uncertainty in the scope of projects and engineering characteristics, inability to adjust accurately, and constraints on the accuracy and reliability of index method estimation. , to achieve the effect of multi-scheme estimation management and fast and accurate adjustment
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0039] see figure 1 , is a schematic structural diagram of the method for quickly estimating indicators provided in this embodiment, and the method includes steps S1-S6:
[0040] S1: Obtain the data of historical cases through the indicator library module, and store the data in a structured manner to form an indicator library.
[0041] This step is used to build an indicator library. Specifically, this step includes steps S11-S13:
[0042] S11: Import the xml files of historical cases through the indicator library module, and process the xml files of each historical case through the indicator tool to obtain typical case indicators.
[0043] S12: Through the indicator library module, classify the indicators of typical cases according to the characteristic values of the project overview.
[0044] S13: Through the indicator library module, the data of the classified typical case indicators are stored in a structured manner.
[0045] S2: Decompose the proposed project in the...
Embodiment 2
[0059] see figure 2 , is a structural block diagram of a system for quickly estimating indicators provided in this embodiment. The system includes: an index library module 1, a project management module 2, a retrieval module 3, a storage module 4, an estimation adjustment module 5, and an output module 6.
[0060] In this embodiment, the indicator library module 1 is used to obtain the data of historical cases, and store the data in a structured manner to form an indicator library; the project management module 2 is used to decompose the proposed project to obtain individual projects, and store the individual projects Structured storage of the data; the retrieval module 3 is used to match the proposed project to the index library, and combine the preset weights corresponding to the key content to calculate the similar case indicators with the highest similarity with the proposed project in the index library; the storage module 4. It is used to store the data of similar case ...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com