Holographic reality construction equipment management system based on virtual reality
A technology of virtual reality and construction equipment, applied in the field of electronic information, can solve problems such as improving the training cost and management cost of intelligent equipment, disconnecting the level of system application management, hindering the wide application of intelligent equipment, etc., so as to reduce the amount of calculation and experience delay. Small, the effect of improving the experience effect
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0037] This embodiment discloses a holographic reality construction equipment management system based on virtual reality, including an immersive equipment space rendering module 1, an interactive equipment control module 2, a tactile abnormality feedback module 3, and a VRO-API data communication module 4 , IBMS integration platform 5 and data center 6, the immersive device space rendering module 1 is used to convert the coordinates of the relative position between the user and the device in virtual reality rendering, and the interactive device control module 2 is used to synchronize user body movements and device management, The tactile abnormality feedback module 3 is used to provide tactile feedback to the user on the abnormal state of the device, and the VRO-API data communication module 4 is used to establish an immersive device space rendering module 1, an interactive device control module 2 and a tactile abnormality feedback module 3 Data processing and communication wit...
Embodiment 2
[0064] This embodiment discloses a holographic reality building equipment management system based on virtual reality. The specific system equipment is the same as in Embodiment 1. For intelligent buildings that already have IBMS intelligent building management system and data center 6, the upgraded implementation is adopted. way to implement the present invention.
[0065] Matching space model:
[0066] On the basis of the original IBMS, use its existing space division and equipment point data to match the spatial structure model in the real environment. Considering that the design and planning of the original IBMS are not consistent with the space requirement design of the present invention, it is necessary to split, merge and translate the space model. For example:
[0067] When a single floor of a building has a large area (such as a large single building such as a convention and exhibition center), it is necessary to split the floor and divide a physically large space in...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com