Treatment method of silkworm cocoon degumming wastewater
A treatment method and wastewater technology are applied in the field of treatment of silkworm cocoon degumming wastewater, which can solve the problems of water body loss of self-purification ability, energy waste, environmental pollution, etc., and achieve the effects of reducing environmental and water pollution, improving treatment effect, and protecting the environment.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Examples
Embodiment 1
[0019] A treatment method for silkworm cocoon degumming wastewater, comprising the following steps:
[0020] (1) Acid-base adjustment: adjust the pH of the degumming wastewater to 5.3~5.6, so that the degumming wastewater can reduce the acid-base irritation, which is beneficial to the later treatment, improves the treatment effect, and obtains the acid-base adjusted wastewater;
[0021] (2) Enzymolysis: Add compound enzyme to acid-base adjusted wastewater to make the mass concentration 0.04%, stir for 2 hours, add protease, and continue enzymolysis for 4 hours, first add compound enzyme to decompose macromolecular fat and Pectin component, then add protease to decompose a large amount of sericin in wastewater, avoid the oxidation and decomposition of fat and protein after wastewater discharge consumes a lot of dissolved oxygen, reduce environmental and water pollution, and obtain enzymatic wastewater;
[0022] (3) Primary fermentation: Add sodium selenite to the enzymolysis wa...
Embodiment 2
[0032] A treatment method for silkworm cocoon degumming wastewater, comprising the following steps:
[0033] (1) Acid-base adjustment: adjust the pH of the degumming wastewater to 5.3~5.6, so that the degumming wastewater can reduce the acid-base irritation, which is beneficial to the later treatment, improves the treatment effect, and obtains the acid-base adjusted wastewater;
[0034] (2) Enzymolysis: Add compound enzyme to acid-base adjusted wastewater to make the mass concentration 0.05%, stir for 2 hours, add protease, continue enzymolysis for 4 hours, first add compound enzyme to decompose macromolecular fat and Pectin component, then add protease to decompose a large amount of sericin in wastewater, avoid the oxidation and decomposition of fat and protein after wastewater discharge consumes a lot of dissolved oxygen, reduce environmental and water pollution, and obtain enzymatic wastewater;
[0035] (3) Primary fermentation: Add sodium selenite to the enzymolysis wastew...
Embodiment 3
[0045] A treatment method for silkworm cocoon degumming wastewater, comprising the following steps:
[0046] (1) Acid-base adjustment: adjust the pH of the degumming wastewater to 5.3~5.6, so that the degumming wastewater can reduce the acid-base irritation, which is beneficial to the later treatment, improves the treatment effect, and obtains the acid-base adjusted wastewater;
[0047](2) Enzymolysis: Add compound enzyme to acid-base adjusted wastewater to make the mass concentration 0.06%, stir for 3 hours, add protease, continue enzymolysis for 5 hours, first add compound enzyme to decompose macromolecular fat and Pectin component, then add protease to decompose a large amount of sericin in wastewater, avoid the oxidation and decomposition of fat and protein after wastewater discharge consumes a lot of dissolved oxygen, reduce environmental and water pollution, and obtain enzymatic wastewater;
[0048] (3) Primary fermentation: Add sodium selenite to the enzymolysis wastewa...